Architectural Services For Outdoor Areas – Fördegymnasium, Overall Renovation, Outdoor Area Planning. The Overall Renovation Consists Of Fire Protection, The Building Envelope, The Building Technical Systems Such As Heating, Plumbing, Ventilation, Building Automation And Electrical As Well As A Functional Improvement In The Conversion Of Room Sizes And Space Options. In Addition, A New Modular Building Will Be Built In The Schoolyard For The Max Von Der Grün School, Which Is Currently Housed In Parts Of The Ground Floor Of The Fördegymnasium And In Temporary School Containers. The Intention Is To Divide The Implementation Into 2 Construction Phases, North And South, With School Operations Ongoing And To Relocate To Temporary Replacement Classes (Container Facilities) On The Site. The Existing Outdoor Facilities, Including The Parking Space, Are To Be Largely Restored And Some Areas Unsealed After The Respective Construction Work Has Been Completed. A Sensible Zoning Must Be Carried Out, Connections To Buildings And The New, Spacious Auditorium As The Main Entrance Should Be Integrated Into The Planning. The Use Of The Schoolyard In The Area Of The New Mvdg School Building Must Be Redesigned And The Existing Trees Must Be Taken Into Account. A Clear Separation Between Ongoing School Operations And The Construction Site During The Implementation Phase Is One Of The Most Important Requirements Of Construction Planning And Must Be Taken Into Account As Part Of The Planning So That Good Conditions Are In Place For A Smooth And Rapid Construction Process. Areas: Prepare Parking Areas 6,500 M² Access Roads And Bypasses 1,100 M² Restore Schoolyard Areas 4,500 M² The Free-Standing Sports Hall Building Is Not Part Of The Renovation Measure. The Services To Be Awarded Consist Of: - Service Phases 2-9 Outdoor Area Planning In Accordance With §§ 39 Hoai The Client Intends To Provide The Services Individually Or As A Whole (Stage Contract). The Service Is Scheduled To Begin Immediately After The Order Is Placed. Dates: - Completion Of Container Replacement Classes For Max Von Der Grün-Schule / February 2027 - Completion Of Construction Of The New Max Von Der Grün-Schule In Modular Construction In The Schoolyard / Jan. 2028 - Completion Of Container Replacement Classes For Fördegymnasium / Jan. 2028 - Completion Of The 1St Ba Fördegymnasium / Jan. 2029 - Completion Of Expansion Replacement Classes For Fördegymnasium / Jan. 2029 - Completion Of The 2Nd Ba Fördegymnasium / July 2030 - Dismantling Of Container Replacement Classes / August 2030 - Restoration Of The Parking Space System / By The End Of 2030
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.