GTR 110119512
Tenders Are Invited For Building Construction Work – Shell Construction Work, New Sports Hall, 2Nd Ba
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
110119512
Tendering Authority
Subscribe to view
Tender No
163654-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Building Construction Work – Shell Construction Work, New Sports Hall, 2Nd Ba
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
08-04-2026
Closed
Work Detail
Building Construction Work – Shell Construction Work, New Sports Hall, 2Nd Ba. In The First Construction Phase, The Steglitz-Zehlendorf District Of Berlin Has Built An Extension For The Arndt-Gymnasium Dahlem Atkönig-Luise-Straße 80-84 In 14195 Berlin (Steglitz-Zehlendorf). As Part Of The Second Construction Phase, A New Two-Field Sports Hall Is Being Built On Part Of The Trapezoidal Plot Of The Arndt-Gymansium. Information About The Property: - District: Dahlem - Corridor 17 - Parcel 21 - Total Area: 20,230 M² The Property Has A Height Difference Of Approx. 1.45 M From South To North (Height Coordinates Of The Open Spaces Are Between 53.10 M Above Sea Level In The Northeast And 51.65 M Above Sea Level In The Southwest); It Is Owned By The State Of Berlin And Is Assigned To The School Authoritys Specialist Assets. The Area On Which The New Sports Hall Is To Be Built Is Currently Used As A Sports Area Or As An Open Space And Break Area. In Preparation For This New Construction Project, An Extension (Münterbau) Built In The 1970S Was Demolished, Thus Creating A Sufficiently Large Open Space On The Property For The Construction Site. This Area Intended For The Construction Site Facilities, Like The Construction Site Of The New Building Itself, Can Be Reached Via Bitterstrasse. Apart From The Sidewalk Crossing, Public Road Land Will Not Be Used For The Construction Project. The Planned New Construction Of The 2-Field Sports Hall Is Divided Into The Actual Sports Hall Wing, Which Is Arranged Parallel To Bitterstrasse. The Flat Part Of The Building, Which Accommodates The Changing Rooms And Additional Rooms, Is Oriented Towards The Schuhof, So That The New Building Can Be Accessed Directly From Inside The School Grounds. Regardless Of This, The New Sports Hall Will Also Be Available For Club Sports Once It Is Completed. The Structure Was Placed On The Property Taking Into Account The Distance Areas To Be Verified And Under The Premise Of Maximum Protection Of The Tree Population. Information About The New Construction Of The Sports Hall: - Dimensions Approx. 46.65 X 36.32 M - Height: Approx. 9.26 M (Sports Hall) Or 4.39 M (Social Wing) Construction: The Sports Hall Will Be Built In Solid Construction (Reinforced Concrete/Masonry Mixed Construction). The Sports Hall Roof Is Designed As A Gable Roof And Consists Of Prestressed Concrete Trusses With A Roof Covering Made Of Trapezoidal Steel Profiles (T150.1). It Is A Warm Roof With Extensive Green Roofs. The Roof Of The Social Wing Consists Of A Reinforced Concrete Ceiling. The Building Does Not Have A Basement. The Building Has No Internal Fire Walls; It Is Not Intended To Be Used As A Meeting Place. Lighting Of The Sports Hall Via Skylight Strips Made Of Profile Glass, Divisible Into Two Separately Usable Sports Hall Parts Using A Dividing Curtain.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
bb772495-d76e-440e-9f33-9165240d75b3.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.