1 The Subject Of The Order Is The Design And Implementation Of The Electrical Installation In The Brine Graduation Tower Located On The Premises Of The Wieliczka Salt Mine (Park Kingi 1, Wieliczka.2 A Detailed Description Of The Subject Of The Contract Is Included In Annex No. 6 To Swz3 As Part Of The Implementation Of The Subject Of The Order, The Contractor Is Obliged To: 1) Prepare Design Documentation For The Replacement Of Basic And Evacuation Lighting And Arrange It With Persons Supervising The Implementation Of The Subject Of The Contract On The Part Of The Ordering Party, 2) Purchase And Deliver: A) Lamps, Cables And Lighting Fixtures, B) Evacuation Lighting Switchgear With A Central Battery Battery, 3) Development Of A Work Schedule, 4) Reconstruction Of The Main Tg Switchboard In Tężnia Solankowa, 5) Installation Of The Evacuation Lighting Switchgear With A Central Battery Battery, 6) Replacement Of The Basic Lighting Lighting Installation, 7) Replacement Of The Evacuation Lighting Lighting Installation With The Control System, 8) Replacement Of The Single-Phase Plug-In Sockets Installation, 9) Preparation Of As-Built Documentation, Including The Descriptive Part, The Calculation Part, Drawings And Diagrams.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.