Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
12-03-2026
Work Detail
Quotation are invited for NG Slam Shut off Valves Servicing for D-REP. D-REP NGPRS GORTER 2# NG SLAM SHUTOFF VALVE INSPECTION & SERVICING.NOTE: ONLY SUPPLIERS WITH SIMILAR EXPERIENCE WITH NG SLAM SHUTOFF VALVESERVICING WILL BE CONSIDEREDVALVE SPECS:SLAM SHUT OFF VALVE, COMPLETE ASSEMBLY WITH ACTUATOR, MODEL-HSV-086,VALVE SIZE-2"(FULL BORE) CLASS 300 FLANGE ENDS,VALVE MATERIALSA216WCB,PRESSURE-50 BAR,TMIN-TMAX: -20/80 C, KKS NO-EKG71AA002,MAKE-GORTERCONTROL SCHO ONHOVEN HOLLAND, FOR WHRB-11/12/13 NGPRS SLAM SHUT OFF VALVESCOPE OF WORK:-COLLECTION OF THE VALVE FROM DEWA PREMISES.- VERIFY VALVE TAGGING AND DOCUMENTATION-SPARE KIT IS AVAILABLE WITH DEWA AND SHALL BE PROVIDED TO THECONTRACTOR WHEREVER REQUIRED. IF ANY PARTS A RE NOT AVAILABLE, CONTRACTORSHOULD REPLACE WITH OEM SPARE OR EQUIVALENT.-FULLY DISMANTLE THE VALVE AND CLEAN ALL THE COMPONENTS.-INS PECT ALL INTERIOR PARTS.-PARTS THAT SHOW SIGNS OF WEAR AND TEAR, OR OTHER PECULIARCHARACTERISTICS SHOULD BE REPLACED. ALSO REPLACE A LL THE SEALS ANDGREASE.-REMOVE ALL INSTRUMENTATION FROM THE ACTUATOR. INSPECT ALLINSTRUMENTATION AND CHECK TO SEE WHICH PARTS MUST B E REPLACED OR WHATSPECIAL MEASURES MUST BE TAKEN DURING INSPECTION BASED ON THEINSTRUCTIONS IN THE MANUAL FOR EACH INSTRUMENTATION C OMPONENT.-RE-INSTALL AND CALIBRATE ALL OF THE INSTRUMENTATION COMPONENTS.-RE-INSTALL THE ACTUATOR AND THE INSTRUMENTATION.-PERFORM A FUNCTION TEST ON THE VALVE WITH ACTUATOR WITHOUT ANY PRESSUREFROM THE MEDIUM.-CHECK ALL THE INDIVIDUAL INSTRUMENTS FOR PROPER OPERA TION ANDCALIBRATION.- ANY REPLACED MATERIALS SHOULD BE EQUIVALENT TO THE EXISTING INSTALLEDPARTS.-WHEN PERFORMING MAINTENANCE AND IN SPECTION ACTIVITIES ON PARTS, SPECIALATTENTION MUST BE PAID TO SEALS AND SEALING SURFACES. THESE MUST BE INPERFECT CONDITION, WITH N O SCRATCHES, CORROSION AND/OR ANY EROSION. WHENSEALS ARE REMOVED, THEY MUST ALWAYS BE REPLACED BY NEW SEALS.-THE REASSEMBLY MUST BE PERFORMED IN A CLEAN ENVIRONMENT. ONE MUSTALWAYS PREVENT DUST OR SMALL PARTICLES FROM GETTING INTO THE OPEN VALVE.-WORKMANSHIP WARRA NTY FOR TWO (2) YEARS.-SANDBLASTING AND PAINTING OF THE VALVE.-INSPECTION REPORT SHALL BE SUBMITTED ALONG WITH RECOMMENDATIONS.-PRES SURE TESTING AND ADJUSTMENT TO BE CARRIED OUT IN THE PRESENCE OFTHE DEWA ENGINEER. Qty: 1 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332600596)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.