Full Site Civil Engineer With Additional Charges, General Manager With Additional Charges, Executive Project Of Concrete Structure, Executive Project Of Storm Drainage, Manual Drilling Of Auger Type Pile, Including Spacing, Excluding Frame, Structural Concrete, Transport And Removal Of Excavated Material, 05/03/2026 - 15:04:15, Cutting, Bending And Assembly Of Ca 50/60 Steel, Including Spacer - 2.1.2, Supply Of Structural Concrete, Pumped Machined, With Fck 25Mpa, Including Launching, Densification And Finishing, Manual Excavation Of Trench With A Depth Of Less Than Or Equal To 1.5M, Including Lateral Discharge, Including Spacer - 2.2.2, Densification And Finishing - 2.2.3, Including Lateral Unloading - 2.3.1, Including Spacer - 2.3.2, Densification And Finishing - 2.3.3, Full Concrete Block Masonry Without Reinforcement, In Concrete With Fck Of 20Mpa, Esp. 19Cm, For Cladding, Including Mortar For Laying (Detail D - Seds Notebook), Including Spacer - 2.5.1, Formwork And Molding Of Resin Plywood, Esp. 12Mm, Reuse (3X), Exclusive Shoring - 2.5.2, Densification And Finishing - 2.5.3, Including Spacer - 3.1.1, Exclusive Shoring - 3.1.2, Densification And Finishing - 3.1.3, Sealing Masonry With Concrete Block, Including Mortar For Laying, Drain Barbican, Dn 100 Mm, With Drainage Material. Af_07/2021, Demolition Of Masonry For Any Type Of Block, Mechanized, Without Reuse. Af_09/2023, Transport Of Material Of Any Nature By Truck, Distance Greater Than 2Km And Less Than Or Equal To 5Km, Within The Urban Perimeter, Excluding Loading, Including Unloading, Mechanical Loading Of Material Of Any Nature On Truck, Exclusive Of Transport