GTR 109996277

Tenders Are Invited For Reconstruction Of The Road In The Scope Of Construction Of Lighting Along Prószkowska Street In Opole On The Section From The Opole University Of Technology Roundabout To The City Limits.

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
109996277
Tendering Authority
Subscribe to view
Tender No
ZP.271.8.3.2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Road In The Scope Of Construction Of Lighting Along Prószkowska Street In Opole On The Section From The Opole University Of Technology Roundabout To The City Limits.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
20-03-2026 Closed
Work Detail
Subject Of The Order: Reconstruction Of The Road In The Scope Of Construction Of Lighting Along Prószkowska Street In Opole On The Section From The Opole University Of Technology Roundabout To The City Limits. Stage I. Preparation, Delivery And Installation Of An Information Board With Dimensions Of 120 X 60 Cm - 1 Piece, In Accordance With The Guidelines And The Template Provided At The Link: Https://Www.Funduszeeuropee.Gov.Pl/Strony/O-Funduszach/Fundusze-2021-2027/Prawo-I-Dokumenty/Zasady-Komunikacji-Fe/ And In Accordance With The Annex To The Swz. The Board Should Be Placed On Two Or One Post (Steel Sheet, Galvanized With A Bent Edge), At A Height Of At Least 2.20 M, Counting From The Lower Edge To The Ground Level, And In The Area Of Pedestrian And Bicycle Paths, This Height Should Be At Least 2.50 M. The Board Should Be Placed With Visibility To Existing Road Signs And Traffic Lights, At A Distance From These Elements Of At Least 10 M In Built-Up Areas And 20 M Outside. Built-Up Area. The Location Will Be Indicated At The Stage Of Contract Implementation, And A Possible Relocation Of The Signs Should Be Estimated After The Construction Of The Pedestrian And Bicycle Path (The Sign Must Be Installed Within 1 Month From The Date Of Handing Over The Construction Site And Possible Relocation After The Completion Of Construction Works Within The Task). Stage Ii Execution Of Construction And Electrical Installation Works Related To The Construction Of Street Lighting Together With A Lighting Control System For The Task Entitled: Reconstruction Of The Road In The Scope Of Construction Of Lighting Along Prószkowska Street In Opole On The Section From The Opole University Of Technology Roundabout To The City Limits, In Accordance With The Technical Documentation - Appendix To Swz.4. Order Completion Date: Stage I - Up To 1 Month From The Date Of Handover Of The Construction Site. Stage Ii - Up To 6 Months From The Date Of Handover Of The Construction Site.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8f369b3c-8443-4875-afae-0d42a531d294.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you