GTR 109971023

Tenders Are Invited For Electrical Engineering Installation Works – Renovation Of The Robert Bosch Comprehensive School Sports Hall; Measurement, Control And Regulation Technology (City Of Hildesheim)

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
109971023
Tendering Authority
Subscribe to view
Tender No
151299-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Electrical Engineering Installation Works – Renovation Of The Robert Bosch Comprehensive School Sports Hall; Measurement, Control And Regulation Technology (City Of Hildesheim)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
08-04-2026 Closed
Work Detail
Electrical Engineering Installation Works – Renovation Of The Robert Bosch Comprehensive School Sports Hall; Measurement, Control And Regulation Technology (City Of Hildesheim). A Building Automation (Ga) With Four Information Focal Points (Isp) With Control Cabinets Is Planned. Each Isp Receives A Control Cabinet With Power Units, Modules, Fuses, Inputs/Outputs And Automation. There Are Three Air Conditioning Systems (Isp 1, 3 And 4) And One Heating System (Isp 2). Isp 1-3 Are Set Up In The Technical Room, Isp 4 Is Set Up Outside Next To The Ahu. The Electrical Supply To The Msr Control Cabinet Is Carried Out By The Electrical Department, The Electrical Control Lines Are Carried Out By Msr Technology. The Cabling Of All Electrical Components Is Generally Halogen-Free. 5,000 M Of Sheathed Cable And 10,000 M Of Installation Cable Are Required. The Installation Takes Place On Cable Trays Or In Pipe Or Cable Routing. 200 M Of Cable Tray Including Fittings And Connectors And 500 M Of Pipe Are Required. All Connections For The Control And Measuring Devices (Sensors, Actuators, Thermostats, Etc.), Fan Motors, Pumps, Etc. Are Connected In The Control Cabinets. These Include: - In Ventilation Technology: Three Air Conditioning Units, 24 Swirl Air Diffusers, 43 Fire Dampers, 47 Volume Flow Controllers As Well As Various Sensors And Detectors, - In Heating Technology: Seven Heating Circuits, Ten Radiant Ceiling Panels And A Radiator Running Hall.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d5449d4e-9f32-44bf-a532-41730ac11f5c.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders