Infrastructure Development - Water And Sewer . The Construction Of This Project Includes Work Relating To Removing And Replacing The Infrastructure, Located In Edberg, Alberta, Canada. This Includes, But Is Not Limited To, The Following: Highway 609 Operations - Horizontal Directional Drilling - 200Mm (8”) Diameter Sanitary Main Line – Approximately 175M Horizontal Length - 100Mm (4”) Diameter Sanitary Service Lines - One (1) Residential Location On The South Side Of Highway 609 (Opposite Side Of The Highway From Where The New Main Line Is To Be Located. - 100Mm Diameter Sanitary Service Connections – Five (5) Locations - Located On The North Side Of Highway 609 - At/Near The New Sanitary Main Line Location - Residential Locations On The North Side Of Highway 609 (Same Side As The New Main Line Is To Be Located) Sanitary Main Line Connections - Two (2) Sanitary Manholes - One (1) At The East End – Railway Avenue - One (1) At The West End – 1St Avenue West - Backfilling And Compaction - Flushing, Cleaning, And Testing Of The Sanitary System - Landscaping, Topsoiling, And Finishing All Impacted Highway 609 Areas. 1St Avenue West - Open Excavation (This Can Be Proposed And Priced As Horizontal Directional Drilling (Hdd) Operations If A Contractor Chooses To Do So) - Sanitary And Water Main Lines And Services - One (1) Service Located At/Near The South End Of 1St Ave West (Library) - Sanitary And Water Main Connections - Existing Sanitary Mh Located At/Near The Intersection Of 1St Street South. This One (1) Is To Be Decommissioned. The Inlets/Outlets Are To Be Plugged With Concrete Or Non-Shrink Grout, The Mh Is To Be Filled/Compacted With Clay Or Gbc, And Left In Place. - New Sanitary Mh To Be Installed At New Intersection Connection To Railway Ave (North Of The Current/Existing Mh) - Existing Water Main Lines At/Near The Intersection Of 1St Street South (Pvc) - Existing Water Main Line At/Near The Intersection Of Highway 609 (Hdpe Installed In 2024) - Existing Water Main Line Running E-W Along The North Side Of Highway 609 (Hdpe Installed In 2024) Water Service(S) - Village Recreation Grounds Are Location Se Of The Intersection Of Railway Ave And Highway 609. A New Water Service Is To Be Directional Drilled, Across Highway 609 (Perpendicular To The Highway) Then Terminated At The Recreation Grounds. This Service Includes A Dry Hydrant (Flushing Hydrant) At The Termination Location. Fire Hydrants - One (1) Located At/Near The Intersection Of 1St Street South. Exact Location Of This Is To Be Determined, As Its Connection May Be Located On 1St Street South. This Is A Deletable Item In The Unit Price Schedule (Ups). - One (1) Located At/Near The Intersection Of Railway Ave. This Is A Deleable Item In The Ups. - Backfilling And Compaction All Applicable Areas - Flushing, Cleaning, And Testing Of The Applicable Infrastructure Piping Systems - Landscaping, Topsoiling, And Finishing All Impacted Areas. Damages - Important To Note That Any Areas Impacted During Construction Operations Are To Be Reinstated To Their Pre-Construction State, Or Better, Condition. This Would Include Any Damage To The Existing Asphalt Surface In The Highway Row, Etc, And All Costs Are To Be At The Contractors Expense, Considered Incidental To The Work. Information/Pre-Bid Meeting**Mandatory Thu•Mar 19, 2026•11:00 Am (Mt)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.