Bids Are Invited For Tnd0023734 - Hwy 41:14, Hwy 600:02 & Hwy 13:20 - Grading, Gbc, Cold Milling, Acp, Intersection Improvements At Various Locations, Street Light Installation And Other Work
Bids Are Invited For Tnd0023734 - Hwy 41:14, Hwy 600:02 & Hwy 13:20 - Grading, Gbc, Cold Milling, Acp, Intersection Improvements At Various Locations, Street Light Installation And Other Work
Tender Available Date: Wednesday March 4, 2026.Tender Closing Date: Wednesday April 15, 2026.Project Inquiries: Kenneth Adagala, Project Procurement Officer, Alberta Transportatione-Mail: [email protected] Will Only Be Received By Email At [email protected], Before 2:01:00 P.M., For Construction Of The Following Work:Tnd0023734grading, Granular Base Course, Cold Milling, Asphalt Concrete Pavement, Intersection Improvements At Various Locations, Street Light Installation And Other Work 41:14 Par 121 To 4 Km N Of Hwy 600Kilometre 12.695 To 41.756600:02 11 Km W Of The Town Of Provost To Hwy 13Kilometre 26.766 To 42.497 13:20 W Of Hwy 899 To 16 Km E Of The Town Of Provostkilometre 44.300 To 60.985Central Regionapproximate Quantities:237 860 Tonnes Supply Of Aggregate – With Option6 800 Metrescutting Of Pavement36 580 Cubic Metres Common Excavation24 300 Cubic Metres Borrow Excavation – Contractor Supplied23 760 Cubic Metres Common And/Or Borrow Excavation Loaded To Trucks5 500 Cubic Metres Subgrade Excavation6 500 Square Metres Erosion Control Barrier (Silt Fence)1 000 Metres Culverts - Supply And Install (600 Mm Dia. C.S.P.)40 910 Square Metres Preparing Subgrade Surface (First Layer)35 000 Tonnes Granular Base Course Des. 2 Class 25760Tonnes Gravel Surfacing Des. 4 Class 2071 000 Square Metres Topsoil Placement19 190 Square Metres Slope Texturing55 000 Square Metres Cold Milling Asphalt Pavement - 50 ≪Mm Depth≫14 900 Square Metres Cold Milling Asphalt Pavement - 70 ≪Mm Depth≫65 100 Tonnesasphalt Concrete Pavement – Eps Mix Type H2 (Pg 58-28)137 000 Tonnes Asphalt Concrete Pavement – Eps Mix Type M1 (Pg 52-34)63.5Kilometres Milled Rumble Strip - Gap Edge Line61.8Kilometres Roadway Lines - Supplying Paint And Painting (Directional Dividing And 2 Edge Lines)790 Posts Flexible Guidepost/Delineator - Round - Supply And Install3 840 Metres Trenching And Backfilling3 285 Metres Secondary Cable - Supply And Install (2C#4 Teck 90 Hl Cable)1 035 Metres Secondary Cable - Supply And Install (2C#6 Teck 90 Hl Cable)Contractor To Supply All Materials.Contract Completion Date: October 15, 2026.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.