Tenders Are Invited For Marketing Research To Identify Potential Contractors And Determine The Estimated Cost For: 1. Performing Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Kup - 3100 Reg. No. 28/4-21-0167, Operated At The Facility Of Mozyr Oil Refinery Ojsc, Energy Production, Installation - Steam And Gas Turbine Power Plant (Hereinafter Referred To As Lot No. 1); 2. Carrying Out Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Whb - 201 Reg. No. 28/4-21-0210, Operated At The Facility Of Mozyr Oil Refinery Ojsc, A Hydrogen Production Unit For The Processing Of Heavy Oil Residues (Hereinafter Referred To As Lot No. 2); 3. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime, Including Pre-Boiler Water Treatment Of The Steam Generator (Reboiler) T-126N Reg. No. 28/4-21-0146, Commissi
Tenders Are Invited For Marketing Research To Identify Potential Contractors And Determine The Estimated Cost For: 1. Performing Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Kup - 3100 Reg. No. 28/4-21-0167, Operated At The Facility Of Mozyr Oil Refinery Ojsc, Energy Production, Installation - Steam And Gas Turbine Power Plant (Hereinafter Referred To As Lot No. 1); 2. Carrying Out Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Whb - 201 Reg. No. 28/4-21-0210, Operated At The Facility Of Mozyr Oil Refinery Ojsc, A Hydrogen Production Unit For The Processing Of Heavy Oil Residues (Hereinafter Referred To As Lot No. 2); 3. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime, Including Pre-Boiler Water Treatment Of The Steam Generator (Reboiler) T-126N Reg. No. 28/4-21-0146, Commissi
Marketing Research To Identify Potential Contractors And Determine The Estimated Cost For: 1. Performing Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Kup - 3100 Reg. No. 28/4-21-0167, Operated At The Facility Of Mozyr Oil Refinery Ojsc, Energy Production, Installation - Steam And Gas Turbine Power Plant (Hereinafter Referred To As Lot No. 1); 2. Carrying Out Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Whb - 201 Reg. No. 28/4-21-0210, Operated At The Facility Of Mozyr Oil Refinery Ojsc, A Hydrogen Production Unit For The Processing Of Heavy Oil Residues (Hereinafter Referred To As Lot No. 2); 3. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime, Including Pre-Boiler Water Treatment Of The Steam Generator (Reboiler) T-126N Reg. No. 28/4-21-0146, Commissioned In 1999 At The Mozyr Oil Refinery Ojsc, Petrochemical Production, Combined Fuel Oil Processing Unit, Section 100 - Vacuum Distillation Unit For Fuel Oil (Hereinafter Referred To As Lot No. 3); 4. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime Of The Steam Generator (Reboiler) T-202 Reg. No. 28/4-21-0147, Put Into Operation In 2002 At The Mozyr Oil Refinery Ojsc, Petrochemical Production, Combined Fuel Oil Processing Unit, Sections 200 - Tar Visbreaking Unit (Hereinafter Referred To As Lot No. 4); 5. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime Of The Steam Generator (Reboiler) T-205/1 Reg. No. 28/4-21-0148, Put Into Operation In 2002 At The Mozyr Oil Refinery Ojsc, Petrochemical Production, Combined Fuel Oil Processing Unit, Sections 200 - Tar Visbreaking Unit (Hereinafter Referred To As Lot No. 5); 6. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime Of The Steam Generator (Reboiler) T-205/2 Reg. No. 28/4-21-0149, Put Into Operation In 2002 At The Mozyr Oil Refinery Ojsc, Petrochemical Production, Combined Fuel Oil Processing Unit, Sections 200 - Tar Visbreaking Unit (Hereinafter Referred To As Lot No. 6).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.