GTR 109891730
Tenders Are Invited For Marketing Research To Identify Potential Contractors And Determine The Estimated Cost For: 1. Performing Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Kup - 3100 Reg. No. 28/4-21-0167, Operated At The Facility Of Mozyr Oil Refinery Ojsc, Energy Production, Installation - Steam And Gas Turbine Power Plant (Hereinafter Referred To As Lot No. 1); 2. Carrying Out Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Whb - 201 Reg. No. 28/4-21-0210, Operated At The Facility Of Mozyr Oil Refinery Ojsc, A Hydrogen Production Unit For The Processing Of Heavy Oil Residues (Hereinafter Referred To As Lot No. 2); 3. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime, Including Pre-Boiler Water Treatment Of The Steam Generator (Reboiler) T-126N Reg. No. 28/4-21-0146, Commissi
ICB — International Competitive Bid
Closed
Eastern Europe
Tender Information
GTR Reference
109891730
Tendering Authority
Subscribe to view
Tender No
2026-1314091
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Marketing Research To Identify Potential Contractors And Determine The Estimated Cost For: 1. Performing Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Kup - 3100 Reg. No. 28/4-21-0167, Operated At The Facility Of Mozyr Oil Refinery Ojsc, Energy Production, Installation - Steam And Gas Turbine Power Plant (Hereinafter Referred To As Lot No. 1); 2. Carrying Out Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Whb - 201 Reg. No. 28/4-21-0210, Operated At The Facility Of Mozyr Oil Refinery Ojsc, A Hydrogen Production Unit For The Processing Of Heavy Oil Residues (Hereinafter Referred To As Lot No. 2); 3. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime, Including Pre-Boiler Water Treatment Of The Steam Generator (Reboiler) T-126N Reg. No. 28/4-21-0146, Commissi
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Commonwealth of Independent States, CIS
Last Date of Bid Submission
11-03-2026
Closed
Work Detail
Marketing Research To Identify Potential Contractors And Determine The Estimated Cost For: 1. Performing Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Kup - 3100 Reg. No. 28/4-21-0167, Operated At The Facility Of Mozyr Oil Refinery Ojsc, Energy Production, Installation - Steam And Gas Turbine Power Plant (Hereinafter Referred To As Lot No. 1); 2. Carrying Out Operational Testing And Work On Adjusting The Water Chemistry Regime, Including Pre-Boiler Water Treatment Of The Steam Recovery Boiler Whb - 201 Reg. No. 28/4-21-0210, Operated At The Facility Of Mozyr Oil Refinery Ojsc, A Hydrogen Production Unit For The Processing Of Heavy Oil Residues (Hereinafter Referred To As Lot No. 2); 3. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime, Including Pre-Boiler Water Treatment Of The Steam Generator (Reboiler) T-126N Reg. No. 28/4-21-0146, Commissioned In 1999 At The Mozyr Oil Refinery Ojsc, Petrochemical Production, Combined Fuel Oil Processing Unit, Section 100 - Vacuum Distillation Unit For Fuel Oil (Hereinafter Referred To As Lot No. 3); 4. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime Of The Steam Generator (Reboiler) T-202 Reg. No. 28/4-21-0147, Put Into Operation In 2002 At The Mozyr Oil Refinery Ojsc, Petrochemical Production, Combined Fuel Oil Processing Unit, Sections 200 - Tar Visbreaking Unit (Hereinafter Referred To As Lot No. 4); 5. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime Of The Steam Generator (Reboiler) T-205/1 Reg. No. 28/4-21-0148, Put Into Operation In 2002 At The Mozyr Oil Refinery Ojsc, Petrochemical Production, Combined Fuel Oil Processing Unit, Sections 200 - Tar Visbreaking Unit (Hereinafter Referred To As Lot No. 5); 6. Carrying Out Operational Testing And Work On Adjusting The Water-Chemical Regime Of The Steam Generator (Reboiler) T-205/2 Reg. No. 28/4-21-0149, Put Into Operation In 2002 At The Mozyr Oil Refinery Ojsc, Petrochemical Production, Combined Fuel Oil Processing Unit, Sections 200 - Tar Visbreaking Unit (Hereinafter Referred To As Lot No. 6).
Key Value
Tender Value
1 - BYN
Tender Documents
Global Tender Document
2ccb50bf-250b-4861-b066-e53a77daac72.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.