1. The Subject Of The Order Is The Implementation Of An Investment Task Entitled: Active Toddler In The Rajgród Commune - Adaptation Of Rooms For The Creation Of A Childrens Club In The Rajgród Commune Consisting In The Reconstruction Of The Premises For The Needs Of A Childrens Club, Located At Ul. Zabielski 6, 19-206 Rajgród.2. The Scope Of Work Includes, Among Others: 1) Demolition And Preparatory Works: Removal Of Part Of Partition Walls And Construction Of New Ones, Installation Of Suspended Ceilings, Wall And Floor Coverings, 2) Replacement Of Water Supply, Sanitary And Central Heating Installations; 3) Replacement Of Electrical And Lighting Installations, Including Installation Of Emergency Lighting And Evacuation Signs; Installation Of An Intercom, 4) Replacement Of Windows And Doors, 5) Installation Of Air Conditioners, 6) Finishing And Painting Works Inside And On The Facade; 7) Delivery And Installation Of Fire Extinguishers And Smoke And Co Detectors (Sensors In Playrooms And The Kitchen); 8) Delivery And Installation Of Kitchen And Bathroom Equipment And Facilities For People With Disabilities; 9) Delivery And Assembly Of A First Aid Kit With Equipment (Basic Dressings, Basic Means Necessary For Providing First Aid, Instructions On The Principles Of Providing This Aid), 10) Carrying Out The Necessary Measurements And Checks, Including: - Tightness Tests, - Physicochemical And Microbiological Tests Of Drinking Water, - Electrical Measurements, - Lighting Intensity Measurements, - Tests Of Systems For Ozn, - Performance Measurements Ventilation/Chimney Sweep Protocol3. As Part Of The Execution Of The Order, The Contractor Will Ensure The Following Social And Environmental Aspects: 1) Environmental Aspects (Green Procurement) Dnsh (Do No Significant Harm) Principle: The Contractor Is Obliged To Carry Out The Works In Accordance With The Principle Of Doing No Significant Harm For Purposes Such As Mitigating Climate Change, Circular Economy Or Biodiversity Protection. Water Saving: An Obligation Is Imposed To Install Fittings That Reduce Water Consumption, E.G. Faucets With Aerators And Flushers. With A Two-Part System. As Part Of The Acceptance, Documents Confirming These Solutions Are Required. Energy Efficiency: The Contractor Must Provide Documentation Confirming The Energy Class Of The Installed Devices And Heat Transfer Coefficients For The New Windows And Doors. Waste Management: The Contractor Must Present Waste Transfer Cards Or Appropriate Statements Regarding Bdo, Confirming The Lawful Treatment Of Construction Waste. Limitation Of Hazardous Substances: Materials Must Be Free Of Substances. Of Very High Concern (Svhc) In Accordance With The Reach Regulation. Epd Certification: The Contractor Is Obliged To Use Materials With An Environmental Product Declaration (Epd) Type Iii. Emissions: The Contractor Must Limit The Emission Of Noise, Dust And Pollutants While Carrying Out The Works.2) Social Aspects Principle Of Equal
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.