Local Administration, Construction Shed, Made Of Resin Plywood, Including Sanitary Facilities And Dermg Standard Furniture, Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_032022_Ps, Mobilization And Demobilization, Regularization And Compaction Of Predominantly Clayey Soil Subgrade. Af_112019, 02/27/2026 - 09:25:04, 02/27/2026 - 10:03:10, 02/27/2026 - 10:03:18, 02/27/2026 - 10:03:24, 02/27/2026 - 10:03:37, Base Or Subbase Granulometrically Stabilized, With Mixing On The Track And Executed With A Recycler, From Soil 30 Percent Run Spout To 70 Percent, With Deposit Material And Commercial Run Spout Granulometrically Stabilized Base Or Subbase, With Deposit Material And Commercial Run Spout Compacted In Modified Energy Execution, Including Excavation And Loading Of Material Deposit, Supply And Loading Of The Running Spout, Excludes Transport, Execution Of Flooring On An Interlocking Floor, With Hexagonal Block Of 25 X 25 Cm, Thickness 8 Cm. Af_102022, Transport With 14 M Dump Truck, On Paved Urban Road, Dmt Up To 30 Km Unit: Txkm. Af_072020, Supply Of Structural Concrete, Prepared On Site, With Fck 30Mpa, Including Laying, Thickening And Finishing, Cutting, Bending And Assembly Of Ca50 Steel, Diameter 12.5Mm, Including Spacer, Pvc Pipe, Series R, Rainwater, Dn 40 Mm, Supplied And Installed In Branch Of Forwarding. Af_062022, Gate In 2 12 Galvanized Tube With 12 # 12 Wire Screen, Fencing In Concrete Posts, With Galvanized Wire Screen Including Concrete Wall. Af_052018