During The Service Period, The Internal And External Units (Filter, Serpentine And Drain) Of Air Conditioners, Numbering 206 Units, Should Be Cleaned Of Dust And Dirt And Washed With A Special Solution 3 Times Within 1 Year (One Year), And Should Be Monitored And Inspected By Specialized Specialists. Reporting When A Freon Gas Leak Is Detected, Welding Of Damaged Copper Pipes, Dismantling Of The Air Conditioner: During The Disassembly (Removal) Of Split-Type Air Conditioners 24000 Btu/H And The Work To Be Done At A High Distance, The Lifting Basket Crane Must Be Provided By The Company., Installation Of Air Conditioner: 24000 Btu/H Installation Of Split Type Air Conditioners And Will Be Used During Installation (Adhesive Tape, Ordinary Tape, Insulation For Copper Pipe, Electric Cable, Plug (Grounded Plug), Foot And Plastic (Pvc) Drainage Pipes For Air Conditioner Compressor) And Also During Work To Be Done At A High Distance, Injection Of R22 Or R407c Freon Gas (1 Time) Into 50 Air Conditioners (The Gas Must Be Provided By The Company), Injection Of R410 Freon Gas (1 Time) Into 50 Air Conditioners (The Gas Must Be Provided By The Company), Replacement Of Copper Pipes And Insulations 18000 Btu/H-1/4-1/2 - 30 Meters (Material Included), Replacement Of Flexible Water Pipe For Drainage - 200 Meters (Material Included), Provision Of Split Air Conditioners With Universal Remote Controls (Battery Included)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.