Tenders Are Invited For Construction Work For Pipelines, Communication And Power Lines - Engineering - Design And Construction For Construction Of Water Supply Networks In Dimitar Milenkov District, Iskar District
Tenders Are Invited For Construction Work For Pipelines, Communication And Power Lines - Engineering - Design And Construction For Construction Of Water Supply Networks In Dimitar Milenkov District, Iskar District
Construction Work For Pipelines, Communication And Power Lines - Engineering - Design And Construction For Construction Of Water Supply Networks In Dimitar Milenkov District, Iskar District. Engineering - Design And Construction For Construction Of Water Supply Networks In Dimitar Milenkov District, Iskar District. For The Site, The Technical Proposal For The Construction Of The Sewerage Network Of The Dimitar Milenkov District And The Pip For The Water Supply Network Of The Dimitar Milenkov District Have Been Adopted With Protocols No. Соа24-Рд91-254(1)/16.09.2024 No. Соа25-Rd91-46(1)/22.04.2025 Of Etis Etis With Protocol No. Соа25-Рд91-121(1)/06.06.2025. The Pipelines And Facilities Planned For Implementation Are: I. Construction Of A Domestic Sewage Network, Incl. Inspection Shafts And Pavement Restoration 1. Construction Of Sewer Branches Dn300, Incl. Inspection Shafts And Pavement Restoration -3,585.00 M 2. Construction Of Dn500 Sewer Branches, Incl. Inspection Shafts And Pavement Restoration - 168 M 3. Construction Of A Dn200 Pusher - 120 M 4. Construction Of A Building Sewage Diversion For Domestic Water - 230 Pcs. Ii. Construction Of A Storm Sewer Network, Incl. Inspection Shafts And Pavement Restoration 1. Construction Of Sewer Branches Dn300, Incl. Inspection Shafts And Restoration Of Pavement - 110 M 2. Construction Of Sewer Branches Dn400, Incl. Inspection Shafts And Restoration Of Pavement - 160 M 3. Construction Of Sewer Branches Dn700, Incl. Inspection Shafts And Pavement Restoration - 276 M 4. Construction Of Sewer Branches Dn800, Incl. Inspection Shafts And Pavement Restoration - 252 M 5. Construction Of A Building Sewage Diversion For Rainwater - 20 Pcs. 6. Construction Of A Single Street Drain - 20 Pcs. 7. Construction Of A Double Street Drain - 15 Pcs. 8. Energy Extinguishing Shaft - 1 Pc. 9. Kps Q=2Qmax.H=37.02 L/S - 1 Pc. 10. Bridge Channel For Pusher Dn 200. 1 Pc. 11. Discharge Of A Drain Into The River - 2 Pcs. Iii. Water Supply Network 1. Construction Of Street Water Supply Dn110 - 330 M 2. Construction Of Street Water Supply Dn125 - 438 M 3. Construction Of Street Water Supply Dn140 - 788 M 4. Construction Of Street Water Supply Dn90 - 82 M 5. Construction Of Street Water Supply Dn110 - 1,423 M 6. Construction Of Street Water Supply Dn125 - 556 M 7. Construction/Reconstruction Of Building Water Diversion -230 Pcs. 8. Water Meter Shaft - 1 Pc. Iv. Road Works Outside The Trench 1. Road - Restoration Of Road Pavement Outside Trench Excavation For Networks And Facilities (Asphalt Concrete Pavement For Medium Traffic) - 6,570.90 Sq.M. Activity 1. Preparation Of An Investment Project The Investment Project In The Technical Project Phase Is Prepared In Accordance With The Technical Proposal For The Construction Of The Sewerage Network Of The Dimitar Milenkov Quarter And The Pip For The Water Supply Network Of The Dimitar Milenkov Quarter And The Scope Of The Investment Intention. The Investment Project In The Technical Design Phase Should Contain The Following Project Parts: Sewerage; Water Supply; Drainage; Geodesy; Constructive; Vobd And Road; Drainage; Engineering Geological And Hydrogeological Surveys; Electro And Kip And A, Including Skada System; Pbz; Puso; Pb; Expert Assessment Of
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.