Sanitary Works – Plumbing And Heating Installation, Line Renovation. Trade Work Plumbing And Heating Work Line Renovation, Here: Within The Total Of 258 Residential Units (We) And 7 Commercial Units (Ge) As Well As In The Public Areas (Basement/Staircase/Attic) Tender Subject/Services Plumbing Installation: - Dismantling Pipes Dn 15 To 50, Approx. 14,350 Running Meters, Steel Pipe Drinking Water - Dismantling Pipes Dn 40 To 150, Approx. 1,650 Linear Meters, Plastic/Cast For Sw/Rw - Dismantling And Assembly Of Wc, Bw/Du, Wt, Approx. 258 Pieces Each, Including Fittings - Installation Of Basement Pipes, Risers And Apartment Distribution Pipes In Stainless Steel Pipe And Metal Composite Pipe, Dn 15 To Dn 80, Including Insulation, Valves, Accessories And Ancillary/Auxiliary Work For Tw, Tww And Twz, In Total Approx. 19,320 Running Meters. - Installation Of Basement Pipes, Downpipes And Apartment Pipes In Plastic, Dn 40 To 150, Including Insulation, Accessories And Additional/Auxiliary Work For Sw, Rw, A Total Of Approx. 2,980 Running Meters. Tender Subject/Services Heating Installation: - Dismantling Pipes Dn 15 To 25, Approx. 20,980 Running Meters - Installation Of Copper/Stainless Steel Pipes, Dn 15 To Dn 80, Approx. 1,100 Running Meters, Including Insulation - Dismantling/Assembly Of Radiators, Including Accessories, Approx. 1290 Pieces. - Assembly Hast, 2 X Secondary Side, Including Heat Exchanger And Accessories, Including Pressure Maintaining And Make-Up Devices, Including Drinking Water Heating And Accessories - Necessary Ceiling And Wall Breakthroughs For The Installation Of The Pipe Routing Are Included In The Tender, As Is The Provision Of Toilet Containers For The Affected Tenants - Complete And Replacement Dismantling Of Gas Pipes (Dn 15-32). Approx. 13,990 Running Meters. As Well As 265 Pieces. Gas Combination Heaters, Gas Meters And Other Gas Devices