Central-Heating Installation Work – Topoľčianky, Central Logistic Warehouse, Renovation Of Heating Management. The Subject Of The Order Is Construction Work On The Reconstruction Of The On-Site Boiler Room, Which Will Include The Complete Replacement Of The Technology Of The Main Gas Boiler And Also The Technology Of The Alternative Heat Source, Which Is Currently A Coal Boiler, And This Will Be Replaced By A New Technology For Burning Pellets In Combination With Wood Chips. Along With The Reconstruction Of The Boiler Rooms, The Heat Substation Will Also Be Completely Renovated, Together With The Measurement And Regulation System, As Well As The Technical Background For Operating The Boiler Rooms. Outside The Building Of The Boiler House, The Heat Pipe Distributions To The Individual Heated Objects Will Be Completely Replaced, Where The Existing Above-Ground Distributions Will Be Dismantled, Including The Underlying Structure, And They Will Be Replaced By Underground Heat Pipe Distribution Made Of Pre-Insulated Steel Pipes In Largely The Same Route. The Building Consists Of Building Objects: So 01 - Boiler Room Obj. No. 09 So 02 - Heat Conductor
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.