1. The Subject Of The Order Is Construction Work Consisting In The Modernization Of The Selective Waste Collection Point In Dorohucza. Project Titled Modernization Of The Selective Municipal Waste Collection Point In Dorohucza, Submitted Under The Recruitment No. Felu.03.06-Iz.00-0020/25-00, Which Received Funding And Was Co-Financed Under Measure 3.6 Waste Management In The Public Sector (Project Type 1,3,4) Of Priority Iii Protection Of Environmental And Climate Resources Of The European Funds For Lubelskie Program 2021-2027. The Ordering Party Pursuant To Art. 310 Of The Act Indicates That It May Invalidate The Contract Award Procedure If The Funds That The Contracting Authority Intended To Allocate To Finance All Or Part Of The Contract Under The Above-Mentioned Sources Of Financing, Were Not Granted To Him.2. The Subject Of The Order Is The Modernization Of The Selective Municipal Waste Collection Point In Dorohucza (Plots No. 2448, 2449, 2450, District 0003, Trawniki Commune), Serving The Residents Of The Trawniki Commune. The Scope Of Works Includes: 2.1 Preparatory Works: - Measurement Works, - Cutting Down Trees And Removing Logs, Stumps And Branches, - Clearing Bushes And Removing Branches, - Demolition Of The Existing Farm Building, - Demolition Of Existing Boxes, - Demolition Of The Existing Hardening, - Demolition Of The Existing Fence, 2.2 Reconstruction Of The Selective Waste Collection Point: - Construction Of A Social And Residential Building, - Construction Of A Warehouse Building, - Construction Of Parking Spaces, - Construction Of Concrete Boxes, - Construction Of Places For Containers For Selective Waste Collection, - Construction Lighting, - Construction Of A Photovoltaic Installation, - Renovation Of Scales, - Hardening Of The Maneuvering Surface, - Equipping The Facility With Tanks (Containers) For Selective Waste Collection - Construction Of A Fence, - Construction Of A Septic Tank For Liquid Waste, - Installation Of A Power Generator, - Installation Of Monitoring, - Construction Of An Educational Path, - Production And Installation Of Information And Teaching Boards2.5 Finishing Works: - Tidying Up The Area, - Sowing The Area With A Grass Mixture, - Compensatory Planting.3. A Detailed Description Of The Subject Of The Order Includes: 1) Design Documentation, 2) Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb), 3) Description Of The Subject Of The Order (Opz), Annex No. Zalaczniki_Nr_8_Do_Swz_Dokumentacje.Zip).The Bill Of Quantities Attached To The Swz Is Of An Auxiliary Nature. The Contractor Is Obliged To Carefully Check The Number Of Works From The Design Documentation, Opz And Stwiorb. Due To The Fact That The Works Contract Will Be A Lump Sum Contract, In The Event Of A Larger Number Of Works Occurring During The Works, In Any Item Of The Bill Of Quantities It Cannot Be Considered As Additional Works With A Demand For Additional Remuneration. Any Absence In The Bill Of Quantiti