Lot 1 - Junior Construction Civil Engineer With Additional Charges, Lot 1 - General Manager With Additional Charges, Lot 1 - River Transport Of Inputs - Manaus / Manicoré 616 Km Chartered Ferry With 600Hp Pusher For 300 Ton, Lot 1 - Construction Site Sign On Canvas With Digital Printing, Lot 1 - Parametric Composition Of Execution Of A Warehouse On A Construction Site, Outside The Projection Of The Slab, Using Plywood, Furniture And Equipment Not Included. (Reference Sinapi - 104895), 02/26/2026 - 16:09:37, Lot 1 - Parametric Composition For Execution Of Toilet And Changing Room On Construction Site, Furniture Not Included. (Reference Sinapi - 104897)., Lot 1 - Manual Cleaning Of Vegetation On Land With A Hoe. Af_03/2024, Lot 1 - Conventional Lease Of Work, Using Template Of Pointed Running Boards Every 1.50M - 2 Uses. Af_03/2024, Lot 1 - Siding With Metallic Tile. Af_03/2024, Lot 1 - Manual Trench Excavation. Af_09/2024, Lot 1 - Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Natural Soil Adjustment), In A Location With A Low Level Of Interference. Af_01/2026, Lot 1 - Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Lot 1 - Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, 5 Cm Thick. Af_01/2024, Lot 1 - Manufacture, Assembly And Disassembly Of Shoe Formwork, In Sawn Wood, E=25 Mm, 1 Use. Af_01/2024, Assembly And Disassembly Of Formwork For Baldrame Beam, Lot 1 - Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Lot 1 - Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Lot 1 - Concrete Fck = 25Mpa, Mixture 1:2, 3:2, 7 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With 400 L Concrete Mixer. Af_05/2021, Lot 1 - Launch Using Buckets, Thickening And Finishing Concrete In Structures. Af_02/2022, Lot 1 - Manufacture Of Formwork For Pillars And Similar Structures, Made From Resin Plywood Sheet, E = 17 Mm. Af_09/2020, Lot 1 - Manufacture Of Formwork For Beams, With Sawn Wood, E = 25 Mm. Af_09/2020, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10.7 Ca-50 Steel (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation, Densification And Finishing Of Concrete In Structures, Lot 1 - Surface Waterproofing With Cement And Sand Mortar, With Waterproofing Additive, E = 1.5Cm, Applied To Floors, Slabs On The Ground Or Radiators, Lot 1 - Subfloor In 1:4 Mortar Mix (Cement And Sand), Mechanical Preparation With 400 L Concrete Mixer, Applied To Dry Areas On Slabs, Not Adhered, Non-Reinforced Finish, Thickness 6Cm. Af_07/2021, Lot 1 - Execution Of A Sidewalk (Sidewalk) Or Concrete Floor With Cast-In-Place Concrete, Made On Site, Conventional Finish, Thickness 8 Cm, Reinforced. Af_08/2022, Lot 1 - High-Resistance Industrial Flooring, 1 Cm Thick, Including Plastic Expansion Joints And Mechanized Polishing, Lot 1 - Ceramic Floor Covering With Enamelled Plates Measuring 35X35 Cm, Applied Diagonally In Rooms With An Area Of Less Than 5 M². Af_02/2023_Pe, Lot 1 - Planting Emerald Grass Or São Carlos Or Curitibana, In Plates. Af_07/2024, Lot 1 - Manufacture And Installation Of Full Steel Scissors, 16 M Span, For Corrugated Fiber Cement Tile, Metallic