935693 - 34 St B057 Culvert Replacement - 2675 . This Work Includes The Supply Of All Labour, Materials, Equipment And Services Required To Complete The Replacement Of B057 (Fulton Creek). The Work Includes, But Is Not Limited To The Following: Mobilization And Demobilization Road Closure Traffic Accommodation Environmental Construction Operation (Eco) Plan Demolition And Disposal Of Bridge Structure Excavation - Structural Supply, Assembly And Installation Of 22M Of Precast Box Culvert (2,440 Mm X 1,220 Mm) Backfill - Crushed Granular Backfill - Non-Granular Heavy Rock Riprap (Class 1) Pavement And Concrete Removal - Asphalt Course Supply Gravel To Jobsite - Gravel 3-20 Base Non-Woven Geotextile Filter Fabric (Type A) Asphalt Surface - 50 Mm Thick (10 Mm-Ht, Pg 58-28) Asphalt Base - 250 Mm Thick (20 Mm-B, Pg 58-28) Guardrail - Supply, Fabrication, Delivery And Installation Miscellaneous Iron Erosion Control Barrier (Straw Fibre Roll) Erosion Control Soil Covering - Supply And Install (Type B) Seeding Total Suspended Solids (Tss) Testing - Deletable Fish Capture And Release - Deletable Information/Pre-Bid Meeting Tue•Mar 10, 2026•11:00 Am (Mt)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.