GTR 109608793
Tenders Are Invited For Construction Work – Skv Žilina – Reconstruction Of Supply Pipes From The Turia Water Source – I. Stage-02.
ICB — International Competitive Bid
Closed
Europe
Tender Information
GTR Reference
109608793
Tendering Authority
Subscribe to view
Tender No
128852-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – Skv Žilina – Reconstruction Of Supply Pipes From The Turia Water Source – I. Stage-02.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Europe
Political Region
European Union
Last Date of Bid Submission
07-04-2026
Closed
Work Detail
Construction Work – Skv Žilina – Reconstruction Of Supply Pipes From The Turia Water Source – I. Stage-02.. The Subject Of The Order Is: Reconstruction Of The Supply Pipeline From The Turia Plant - 1St Stage. It Starts Before Pd In The Village Of Rosina. Here It Connects To The Existing Supply Pipe, Passes Above The Cooperative To The Asphalt Road, Where It Is Led To The Gardening Settlement In Front Of The Forest. This Is Where The Asphalt Road Ends And The Unpaved Dirt Road Continues To The Front Of The Forest Park. The Pipeline Will Go To The Forest Park, To The Pavement Made Of Interlocking Paving, Up To The Shaft Of The As Chrasť. It Will Be Terminated In The Shaft. The Entire Length Of The Pipeline Is 2,920.22 Designed From A Dn 300 Ductile Iron Pipe. The Used Elbows And Fittings Are Also Designed From Ductile Iron. Two Types Of Cast Iron Pipes Are Proposed. The Main Part Will Be Natural Biozinalium® Pipes, And In Places Where There Is Crossing With El. Hv Management Or Standard Tt-Pe Pipes With A Single-Chamber Neck Will Be Used For Vtl Gas. A Dn 80 Underground Hydrant Will Be Installed At The Point Of Connection To The Existing Dn 200 Steel Water Pipe, Which Will Serve To Clear The Pipe During Its Cleaning. At The Highest Points Of The Route, Deaeration And Aeration Sets Will Be Installed, And At The Lowest Points, Pipe Desilting Will Be Ensured During Cleaning. This Sludge Removal Will Be Solved By Opening The Pipeline Into A 10 M3 Storage Tank, Which Will Be Built Next To The Pipeline For This Purpose. Subsequently, The Water From The Tank Is Pumped Into The Cistern. The Reconstruction Of The Supply Pipe Within The I. Stage Will Consist Of The Reconstruction Of The Oc Dn 200 Pipe To A Ductile Iron Pipe Dn 300 With A Length Of 2920.22 M, The Reconstruction Of Aš Chrasť (New Fittings, Closures, Lv Connection And Data Transfer To Dispatching) And The Construction Of A New Turia Reduction Shaft With Data Transmission To Dispatching. Within The Framework Of The I. Stage, Three Modifications Of The Water Supply System Will Also Be Carried Out: 1) Termination Of The Lt Dn 125 Water Supply System In The Dss Area 2) Termination Of The Lt Dn 150 Water Supply System In The Village Of Turie - Interruption And Installation Of An Underground Hydrant In The Village Of Turie 3) Connection Of The Lt Dn 150 And Lt Dn 125 Pipelines And Interruption For The Connection In The Village Of Turie
Key Value
Tender Value
2,080,006 - SKK
Tender Documents
Global Tender Document
fcefc39a-685a-4eb5-b1a7-13d3ac566ff9.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.