4.1. The Investment Plan Includes The Construction Of A Rural Community Center Building In The Town Of Bełwin In A Closed, Shell State, In The Commune. Przemyśl, On Plots No. 91 And 70/3 Rev. 0001 Bełwin. The Investment Plan Includes The Construction Of A Detached, Single-Story Building, Without A Basement, With An Attic. The Building Will Consist Of Two Parts: Wooden And Brick, With Different Roof Ridge Heights. The Front Elevation Of The Building From The South-West, The Location Of The Entrances To The Building From The North-East. The Community Center Building Will Be Added As A Separate Structure To The Existing Wooden Shelter And Will Not Be Functionally Related To It. Description Of Design Intentions: 1. Earthworks And Preparatory Works.1.1. Carrying Out Measurement Works, 1.2. Mechanical Earthworks - Excavations,2. Concrete And Reinforced Concrete Structures.2.1. Making Sleepers From Sandstone, 2.2. Construction Of A Layer Of C12/15 Concrete, Thickness 10 Cm,2.3. Foundations,2.3.1. Construction Of Reinforced Concrete Foundation Slabs,2.3.2. Construction Of Foundation Walls,2.3.3. Making Reinforced Concrete Rings, 2.4. Construction Of Reinforced Concrete Rings For The Above-Ground Walls And Gable Walls, 2.5. Installation Of Reinforcement Of Building Elements, 2.6. Construction Of A Reinforced Concrete Ceiling Slab, 3. Foundation Insulation.3.1. Execution Of Horizontal And Vertical Bituminous Coating Damp-Proof Insulation, 3.2. Construction Of Moisture-Proof Insulation Using Weldable Felt, 3.3. Thermal Insulation Of Foundation Walls Using Expanded Polystyrene Boards, 10 Cm Thick, 3.4. Implementation Of Damp-Proof And Water-Proof Insulation Using Dimpled Foil, 3.5. Backfilling Of Excavations.4. Masonry Structures.4.1. Construction Of Walls From Cellular Concrete Type 600, 24 Cm Thick, 4.2. Arrangement Of Prefabricated Lintels,5. Chimney 5.1. Construction Of Ventilation Channels From Concrete Blocks, 5.2. Construction Of System Exhaust Ducts, 5.3. Making Chimney Caps, 5.4. Insulation Of The Chimney With Thick Polystyrene Boards. 5Cm,5.5. Execution Of Thin-Layer Acrylic Facade Plaster, 5.6. Installing Nets Protecting The Ventilation Inlets Of Chimneys,6. Roof Truss.6.1. Construction Of The Roof Truss, 6.2. Paying Roof Slopes, 6.3. Double Varnish Protection Of Roof Truss Elements, 6.4. Insulation Of The Building Walls With Ceiling Slabs (20 Cm Thick) In The Attic Part, 6.5. Gluing The Mesh Layer On The Walls, 6.6. Installation Of The Roof Eaves Soffit, 7. Frame Wall.7.1. Installation Of Poles, 7.2. Installation Of Upper Frames And Purlins, 7.3. Protection With A Fungicide And Fire Retardant, 7.4. Execution Of Wall Cladding From Boards, 7.5. Insulation With Windproof Foil, 7.6. Installation Of Thermal And Anti-Sound Insulation With Mineral Wool, 7.7. Construction Of Gr Partition Walls From Plasterboards, On Metal Gratings, 8. Roof Covering.8.1. Roof Covering With Trapezoidal Sheet Metal Coated On Battens, 8.2. Installation Of Ridge Tiles, 8.3. E