1. The Subject Of The Order Is The Expansion Of The Commune Office Building Along With The Demolition Of The Existing Waste Building And The Necessary Technical Infrastructure At 4 Poznańska Street In Kleszczewo. The Planned Expansion Of The Commune Office Building Was Included In The 12Th Category Of Building Structures. The Area Intended For Construction Between The Existing Ug Building And The Single-Story Service And Technical Facility Is Covered With A Brick, Single-Story Waste Building, Which Is Intended For Complete Demolition. The Expansion Is Related To The Construction Of A New 2-Story Wing With An Independent Structure Between The Existing Building Of The Commune Office/2-Story Building And A Single-Story Service And Technical Building On Part Of Plot 17/4 And Part Of Plot 19/1, Kleszczewo Precinct, Kleszczewo Commune At 4 Poznańska Street. Service Building - Office Premises Includes 5 Rooms In The New Wing Of The Service Building Office Space On The Ground Floor And 4 Office Rooms On The 1St Floor. The Height Of The Office Rooms Is 270 Cm To The Level Of The Bottom Of The Suspended Ceiling. All Parts Of The Commercial Building On The Ground Floor Are Designed With A Suspended Ceiling, Ensuring The Height Of The Rooms, In Accordance With The Regulations. The Entrance Door To The New Wing Of The Office Should Be Made As Automatic Sliding Doors. Hygienic And Sanitary Facilities On The Ground Floor, In The Public Area, A Toilet For Disabled People Is Planned, While On The First Floor There Are Separate Mens And Womens Toilets. Due To The Lack Of A Social Room In The Existing Office Building, A Dining Room For Eating Meals With A Rest Area Is Planned In The Planned Part. In The Lower Part Of The Designed Building There Will Be A Utility Room With A Utility Cupboard, A Washbasin And A Place For A Utility Worker. The Entrance To The Room Is Directly From The Premises. The Height Of Hygiene And Sanitary Rooms Is At Least 250 Cm. The Scope Of The Planned Works Includes: • Demolition Of The Existing Single-Story Waste Building; • Possible Disassembly And Change Of The Technical Infrastructure Located Underground; • Construction Of A New, Independent, 2-Story Building - The Wing Of The Commune Office; • Replacement Of Window Joinery And External Blinds In Some Rooms Of The Existing Building Of The Commune Office In The Amount Of 3 Pieces (3X 1.95 M2); • Replacement Of The Surface And Structural Layers Of The Access To The Building, From The Side Of The Street. Poznańska (Current Main Entrance), On An Area Of 40 M2 Made Of Paving Slabs (Color To Be Determined At The Construction Stage); • Replacement Of The Roof Over The Entrance To The Building, From The Side Of Ul. Poznańska (Current Main Entrance), On An Area Of Approximately 20 M22. The Detailed Scope Of Works Includes: A) Bills Of Quantities, B) Detailed Technical Specifications For The Execution And Acceptance Of Construction Works, C) Design Documentation, 3. The Contractor Is Responsi
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.