The Subject Of The Order Includes The Replacement Of A Two-Layer, Jointless, Synthetic Safety Surface And The Replacement Of The Surface, I.E. Artificial Lawn On Grass Mounds With Tunnels And In Their Area, Construction Of A New Roll Lawn In The Playground Area And Repair Of Existing Playground Equipment In The Playground Located In The Pow Green Area At Ul. Kościuszko And Powstańców Śląskich In Rybnik (Within Plots 4493/87, 5944/90, 5820/90, 4491/67). Implementation Of Works Based On The Color Concept Presented By The Ordering Party And The Free Fall Height Hic. Indicated By The Ordering Party In The Opz For Individual Devices. Detailed Description And Scope Of Works: 1. Demolition Works, Preparatory Works2. Assembly Works3. Construction Of Lawns And Plantings4. Repair Worksdocuments Required For The Acceptance Of Works: - Certificate Of Compliance With Pn En 1177 Standards Issued By An Independent Accredited Body As A Result Of The Post-Installation Inspection, - Technical Data Sheet For The Surface Confirmed By Its Manufacturer, - Instructions On Surface Maintenance And Inspection Procedures, - Documents Confirming That The Replacement Elements Of Playground Equipment And Playground Equipment Used For Repair Are Suitable For Use On Public Playgrounds (Approvals, Certificates, Declarations Of Compliance With Standard), General Requirements Of The Ordering Party Regarding The Subject Of The Order: 1. In Order To Complete The Task, The Contractor Is Obliged To Read And Take Into Account The Provisions Of The Standards For Shaping And Maintaining Green Areas Of The City Of Rybnik Available At The Headquarters Of The City Greenery Board And The Provisions Of The Standards For The Protection Of Trees And Other Forms Of Greenery In The Investment Process Available On The Gdoś Government Website. Since The Investment Works Will Take Place In A Park Space In An Intensively Wooded Area, Trees Located Near The Works And Access Roads Should Be Secured In Accordance With The Guidelines Against Mechanical Damage.2. Any Defects In The Aggregate Base Should Be Made Of New Natural Material. If It Is Necessary To Use Recycled Materials, The Contractor Is Obliged To Use Equipment That Will Not Adversely Affect The Quality Of The Works And Will Not Cause Additional Devastation Such Intention Should Be Reported And Agreed With The Employer. In Places Where There Is A Risk Of Damage To The Surface Or Soil Compaction, It Is Necessary To Construct A Temporary Technological Road. The Paths That Can Be Used To Access The Playground Which Is The Subject Of The Contract Were Constructed As Part Of The Investment Carried Out In 2014 For Pedestrian Traffic. In The Event Of Damage To The Paths During The Works, The Employer Informs That During The Works, It Will Be Necessary To Use Construction Technologies That Minimize Dusting Of The Materials Used. Are Not Harmful To The Environment. It Is Especially Important For The Ordering Party That The Principles Of: - Spraying The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.