1. The Subject Of The Order Is The Design And Execution Of Construction Works For The Task: Construction Of Lighting At Ul. Podleska 87-89 (Side) In Mikołów. 2. The Task Includes The Preparation Of A Construction Design (Pzt And Architectural And Construction Design) For The Lighting Of The Section Of The Street In Question. Podleska 87-89 (Side), Along With Obtaining The Necessary Arrangements And All Administrative Permits And Consents Resulting From The Construction Law, As Well As Developing A Technical Design. 3. For Street Lighting. Podleska 87-89 (Side) In Mikołów, P2 Road Lighting Classification Was Determined In Accordance With The En13201 Standard. The Lighting Should Be Based On Fixtures Equipped With Led Sources, Which Will Be Mounted On Aluminum Lighting Poles Placed On Prefabricated Foundations. The Luminaires Will Be Equipped With Zhaga Standard Sockets, Power Supply With Autonomous Reduction (Lighting On - Until 11 P.M. - 100% Power, 11 P.M. Until 5 A.M. - 70% Power, 5 A.M. Until Lighting Off - 100% Power), Power Supply Programmed Via Nfc. The Luminaires Should Allow Integration With The Exedra Master Control System From Schreder. The Purchase Of Controllers For The Luminaires And Integration With The Exedra System Operating In The Mikołów Commune Is Required. In Terms Of Power Regulation, Luminaires Must Ensure The Power Factor Within The Standards Of Tauron Dystrybucja S.A.4. The Street Lighting Installation Will Be Cabled And Powered From The Street Lighting Cabinet Built As Part Of The Task. Cables Along Their Entire Length Should Be Routed In Protective Pipes. Fezn Tape, Min. 4X25, Should Be Placed Along The Cable Routes To Ground The Poles. Describe All Designed Poles In Accordance With The Investors Guidelines. Carry Out The Works In Accordance With The Design Documentation, Polish Standards, Applicable Regulations And Technical Knowledge.5. All Works Are Located Within The Existing Municipal Road And On Plots Owned By The Mikołów Commune. Before Starting Earthworks, The Location Of The Boundary Points Should Be Determined By Measurement, And, If Necessary, Preceded By Activities Aimed At Determining The Boundaries Of The Cadastral Plots.6. Works Near The Existing Underground Infrastructure Should Be Carried Out Under The Supervision Of The Owners Of The Devices, And A Protocol Statement From The Network Owner Is Required Regarding The Lack Of Conflict With The Lighting Network Being Constructed. 7. Construction Works Include The Execution Of Works In Accordance With The Approved Design Documentation, Commissioning Of The Installation And Submission Of A Complete Set Of Required As-Built Documentation And Reporting The Completion Of Works To The Construction Supervision Authority; 8. It Is Reasonable (Or Recommended) For The Contractor To Visit The Site And Clarify Any Doubts Regarding The Pfu At The Stage Of The Tender Procedure.9. The Detailed Subject Of The Order Is Specified In The Attached Functional And Utility Progra
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.