Tenders Are Invited For Reconstruction Of Part Of The Municipal Road No. 080313C Augustowo - Mały Głęboczek - Janówko In The Town Of Janówko

Tender Detail

109376850
IR.271.5.2.2026
Self-Funded
Tenders Are Invited For Reconstruction Of Part Of The Municipal Road No. 080313C Augustowo - Mały Głęboczek - Janówko In The Town Of Janówko
NCB
central europe
European Union
09-03-2026

Work Detail

1. The Subject Of The Order Is The Reconstruction Of Part Of The Municipal Road No. 080313C Augustowo - Mały Głęboczek - Janówko In The Town Of Janówko, Brzozie Commune, District 0003 Janówko, Plot No. 21; 105/1; 150/1; 150/7; 151 Precinct 0005 Mały Głęboczek Plot No. 25. The Scope Of Works Includes Reconstruction Of The Road: - Earthworks - Excavations, Moving, Planting And Removal Of Soil - Making A Base Of Crushed Aggregate. Stab. Mechanically - Laying The Binding Layer Of Asphalt Concrete - Laying The Wearing Course Of Asphalt Concrete - Land Reclamation - Making Vertical Markings Designed Area Development Technical Parameters - Technical Class Of The Road - Municipal Public L - Local - Design Speed Vp = 30 Km/H The Geometric Parameters Of The Road Are As Follows: - Road Width - 4.5 M - Concrete Surface Asphalt - Transverse Slopes - Roof And One-Sided - 2-3% Parameters Of Exits - Width 5.0 M - Asphalt Concrete Surface - One-Sided Transverse Slope Adapted To The Longitudinal Profile Of The Road Side - Width Up To 0.5 M - Crushed Aggregate Surface. Stab. Down. Thick 15 Cm - One-Sided Transverse Fall 8% From The Road Characteristic Technical Parameters Of The Road · Road Class - Municipal Road L Local · Traffic Category - Kr 1 · Length - 999.0 M · Road Width - 4.5 M · Surface - Road: Asphalt Concrete - Exits: Asphalt Concrete All Works Should Be Carried Out In Accordance With Art Construction And Under The Supervision Of An Authorized Person. Note: At Least 3 Days Before The Commencement Of Works, The Contractor Should Perform A Trial Section In The Place Indicated By The Ordering Party. The Area Of ​​The Trial Section Should Be From 400 To 800 M2. The Contractor May Start Constructing The Substructure After The Trial Section Is Approved By The Ordering Party. A Detailed Description Of The Order Is Included In The Appendix To Swz No. 1 - Technical Documentation.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document 4217123f-f922-42dd-8613-07b3d7e71d7e.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail