1. The Subject Of The Order For Part 1 Includes The Performance Of Construction Works Including The Reconstruction Of The Sports Hall Facility In Accordance With The Scope And Provisions Contained In The Swz Together With Annexes Under The Budget Task Entitled: Improvement Of Energy Efficiency Of Schools And Kindergartens In The Rawicz Commune1) The Scope Of Work During The Execution Of The Order Includes The Performance Of All Construction Works In Accordance With The Attached Design Documentation, Bills Of Quantities With Zero Cost Estimates And Applicable Regulations, Incl. In Particular: A) Preparatory Works: Dismantling The Surface Made Of Concrete Cubes, Dismantling The Substructure, Dismantling Insulation, Removing And Disposal Of Rubble, B) Foundation Works, C) Floor Protection Works, D) Construction Of Floors, E) Construction Of Walls From Sandwich Panels In The A Axis And Casing Of Columns In The C Axis, F) Insulation And Insulation Of The Remaining Walls, G) Performance Of Roof Renovation Works, H) Cleaning And Painting Of The Wooden Structure For E30 And Minor Repairs To The Structure, I) Construction Of A Suspended Ceiling, J) Replacement Of Joinery, K) Performance Of Other Works Inside The Building, Including The Construction Of An Ei 60 Fire Protection Division Inside The Buildings In Accordance With The Guidelines Of The Expert Opinion (Connection Of The Sports Hall With The School Building), L) Renovation Of The Roof Structure, M) Construction Of A Band Around The Building, N) Performance Of Drainage Of The Hall Building From The North Side, O) Construction Of An Internal Hydrant Instance, P) Construction Of A Lightning Protection System And Grounding,Q) Execution Of The Lighting Installation (Excluding Cloakrooms),R) Performance Of Other Electrical Works,S) Disassembly And Reassembly Of The Fire Protection Notification System Installed In The Facility Along With The Necessary Inspections And Acceptances,T) Maintenance And Servicing Of Devices During The Warranty Period,U) Verification And Optimization Of Devices During The Warranty Period In Order To Minimize Operating Costs (Mandatory: After A Month And A Year Of Operation Of The Facility; Subsequent Ones At The Request Of The Ordering Party),V) Other Works Accompanying The Proper Execution Of The Works, Including Primarily The Removal And Disposal Of Rubble And Cleaning Works.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.