1. The Subject Of The Order Is The Modernization Of The Structural Network In The Białystok Branch In Buildings A And B.2. Place Of Works: A. Building A With The Central Distribution Point (Cpd) And Two Distribution Points (Pd) Intended For Liquidation - Building Of The 11Th Floor (Including The Basement). B. Building B With Two Storey Distribution Points (Ppd) On The 1St Floor And 6Th Floor - 13Th Floor Building (Including Basement)3. The Contractor Is Obliged To: A. Ensuring At Least Two Installers With Current Authorizations Of The Structured Cabling Manufacturer In The Scope Of Design, Implementation, Supervision, Measurements And Qualification For Warranty Coverage. This Should Be Confirmed With Registered Certificates Issued By The Manufacturer Of The Offered Structured Cabling. B. Having Valid Qualifications And A Certificate Issued To The Company By A Structured Cabling Manufacturer For Installing Structured Cabling. The Installers Certificate Must Be A Temporary Document, Issued For A Maximum Period Of Two Years, C. Performance Of The Subject Of The Contract While Maintaining A 25-Year Warranty From The Manufacturer Of The Structured Cabling System For The Entire Network.4. Scope Of The Subject Of The Ordera. Dismantling The Old Structural And Electrical Installations (Guaranteed); B. Construction Of New Structured Lan Cabling And Installation For Access Points (Ap); C. Construction Of New Fiber Optic Cabling; D. Replacement Of Patch And Connection Cables;E. Execution Of Pel Points – 1011 Pcs; F. Making Ap Points – 80 Pcs.; H. Installation Of A Power Supply System For A Separate Electrical Installation And Multi-Story Electrical Switchboards; H. Execution Of Installations Intended To Power Pel Points, Ict Cabinets, Air Conditioning Devices, Power Supply For Technical Security Systems And Basic Lighting In The Rooms Of Distribution Points;I. Installation Of Plug Sockets (Red Data Sockets And White Sockets) And Separate Electrical Installation;J. Installation Of Anti-Overvoltage And Anti-Shock Protection Installations; K. Piercing Holes In Walls And Ceilings, L. Execution Of Installation Penetrations With A Fire Resistance Class Of Min. Ei60;M. Concreting Holes And Filling Plasters, Applying Gypsum Plasters, Painting Rooms; N. Disassembly And, After Arranging The Structural And Electrical Installations, Reassembly Of The Suspended Ceiling In The Corridors Of The B;O Building. Demolition Of The Aluminum And Glass Wall, Aluminum Partition, Partition And External Walls, Removal Of Radiators In Cpd And Ppd;P. Replacement Of The Existing Antistatic, Non-Flammable Esd Raised Floor In The Cpd And Replacement Of The Existing Carpet With An Antistatic, Non-Flammable Esd In The Ppd;Q. Replacement Of The Suspended Ceiling In The 60X60 Cm System With A Non-Flammable One In Cpd;R. Removal Of Internal Window Blinds, Installation Of Internal Fire Protection Window Curtains. Ei60 In Cpd And Ppd;S. Installation Of New Aluminum Doors With Fire Resistance Cl
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.