The Subject Of The Order Is The Thermal Modernization Of Two Public Buildings Housing The Public Primary School In Gowczakowo, Together With Renovation And Accompanying Works As Part Of The Task Entitled: Program For The Modernization Of Public Buildings In The Strzegom Commune - Public Primary School In Gowałakowo. The Buildings Are Located In Gopałkowo, At Ul. Szkolna 1 And Ul. Parkowa 4. Both Buildings Are Entered In The Municipal Register Of Monuments, Therefore They Are Subject To Conservation Protection And Agreement On Material Solutions To The Extent Specified In The Conservators Opinions Attached To The Design Documentation. The Scope Of The Contractors Obligations Includes: - Performance Of Construction Works For The Scope Specified In The Technical Documentation And Swz, - Installation Of Nesting Boxes Or Shelters For Bats On The Facade, The Need For Which Will Result From The Specialists Opinion; The Material For Assembly Will Be Provided By The Ordering Party, - Ensuring Supervision And Assuming The Functions Of The Construction Manager And Managers Of Industrial Works, - Organization, Security, Insurance And Development And Fencing Of The Construction Site, - Preparing A Bioz Plan, If Necessary, - Agreeing On Material Solutions With The Provincial Conservator Of Monuments, - Organizing And Carrying Out The Necessary Tests, Examinations, Measurements And Acceptances, - Bringing The Construction Site Into Proper Condition And Order After Completion Works, - Removal Of Rubble And Construction Waste To The Landfill And Their Disposal, - Maintaining Order During The Implementation Of The Works And Systematic Cleaning Of The Work Site, Including Access Roads To The Construction Site, Which The Contractor Is Obliged To Clean Of Construction Dirt, - Carrying Out Measurements Of The Anti-Shock Protection Of Low-Voltage Electrical Power Supply Circuits And Measurements Of Lighting Intensity, - Current Removal Of Unusable Materials From The Construction Site To The Waste Landfill And Their Disposal, O If Necessary, - Execution Of Electrical Installation In Accordance With The Conditions Regarding Increasing The Contractual Capacity Issued By Tauron Dystrybucja S.A. Along With Agreeing With The Administrator Of The Final Structure Of The Power Supply Scheme, - Paying Fees For Supervision And Acceptance Of Industry Units, - Comprehensive Geodetic Service Of The Task, Including The Preparation Of An As-Built Geodetic Inventory With Contribution To The Geodetic Resources, - Participation In Meetings And Conferences Designated By The Ordering Party To Discuss Matters Related To The Implementation Of The Task And During The Guarantee And Warranty Period, - Any Additional Costs Related To Carrying Out Construction Works Necessary For Their Correct And Timely Execution, Such As Fees For Occupying The Road (If Necessary), Costs Of Utility Consumption, Fees Related To The Supervision And Technical Acceptance Of Network Administrators And Other Costs Nec
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.