4.1. The Subject Of The Order Is The Construction Of Construction Of Water Supply Infrastructure In The Baligród Commune4.2. The Scope Of The Order Includes: A) Construction Of A Water Supply Network In The Towns Of Zahoczewo And Nowosiółki, - The Task Includes The Construction Of A Water Supply Network With A Total Length Of L = 10,515.30 M In The Towns Of Zahoczewo And Nowosiółki. The Water Pipeline Was Designed With Pe 100 Rc Sdr 17 Pipes, Including: Dn 125X7.4 Mm – L = 8,009.60 Mdn 40X2.4 Mm – L = 1,604.40 Mdn 50X3.0 Mm – L = 541.30 Mdn 63X3.8 Mm – L = 328.70 Mdn 75X4.5 Mm – L = 24.70 Mdn 90X5.4 Mm – L = 6.60 M As Part Of The Task, It Is Planned To Construct: Fire Hydrants Dn 80 Mm – 40 Pcs., Water Meter Wells Dn 1000 Mm And Dn 1500 Mm – 108 Pcs., Water Meters With Remote Reading) Including One Connection End With A Water Supply Node. Construction Of A Well To Increase The Pressure In The Network Along With Energy Supply. The Network Is To Be Constructed Under The Contract With The Contractor, The Installation Will Remain The Property Of The Ordering Party. B) Construction Of A Water Treatment Plant With Water Storage Tanks, - The Task Includes The Construction Of A Water Supply Network With A Total Length Of 1,329.50 M, Including: • Fi 40 Mm – 415.00 M • Fi 50 Mm – 33.00 M • Fi 75 Mm – 480.00 M • Fi 90 Mm – 1.50 M • Fi 125 Mm – 400.00 M And Includes The Construction Of: - A Water Treatment Plant In A Typical 20 Container (20-Foot Container) - Connections To The Sanitary Sewage System Discharging Rinsing Water - Settling Tanks For Purifying Rinsing Water - Sewage Outlet To The Receiver - Raw Water Network: Deep Wells - Suw - Treated Water Network: Suw - Tanks Treated Water Retention - External Electrical Installation (Power Supply And Control Of Deep Well Pumps) - Fences: Suw, Deep Wells, Treated Water Tank - Suw Maneuvering Area - Raw Water Tank V = 15 M3 - Intermediate Water Tank V = 6 M3 - Treated Water Tank 2Xv = 30 M3 - Section Of Water Supply Network Pe Fi 125 Mm Pe - Gate Valves Fi 50 Mm 3 Pcs. Fi 80 Mm, 1 Pc. 100 Mm, 4 Pcs. - Fire Hydrants, Fi 80 Mm, 1 Pc. - Screw Water Meters With Pulse Transmitter, Fi 80 Mm, 1 Pc. - Concrete Water Meter Wells, 1 Pc. - Execution Of Works Consisting In Comprehensive Cleaning, Disinfection And Restoration Of Technical Efficiency Of Existing Deep Wells, Along With Bringing Them To A Condition That Meets Applicable Water Quality Standards. Construction Works At The Wwtp Will Begin After Obtaining Positive Results Of Water Tests In The Wells. C) Construction Of Water Storage Tanks In The Town Of Jabłonki - The Scope Of The Task Includes The Construction Of: • A Water Supply Network Made Of Pe 100 Rc Sdr 17 Dn 125X7.4 Mm Pipes, 270.2 M Long • Water Tanks (Two Underground Tanks With A Capacity Of 30 M3 Each) • A Hydrophore Station Located In An Underground Well • Electrical Installation • Fencing Of The Reservoir Area And Hydrofornide) Construction Of Energy Connections To The Planned Facilities Of The Zaho
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.