Tenders Are Invited For Construction Of A Walking And Cycling Trail With Ecotourism Infrastructure In Cedzyna And Leszczyny In The Design And Build Formula

Tender Detail

109376664
IR.271.1.1.2026
Self-Funded
Tenders Are Invited For Construction Of A Walking And Cycling Trail With Ecotourism Infrastructure In Cedzyna And Leszczyny In The Design And Build Formula
NCB
central europe
European Union
09-03-2026

Work Detail

1. The Subject Of The Order Is The Construction Of A Walking And Cycling Trail With Ecotourism Infrastructure In The Towns Of Cedzyna And Leszczyny In The Design And Build Formula.A) The Task Will Include The Design And Construction Of The Following Elements: - A Walking And Cycling Trail, - On The Plot No. 194/31, District 0002 Cedzyna: • A Shelter For Pedestrians And Cyclists, • A Self-Service Bicycle Repair Point, • Bicycle Racks, • Benches, • Waste Bin, • Hardening The Area. The Planned Arrangement Of The Development Elements Of The Investment Area Is Presented In Drawings Pfu-01.1 And Pfu-01.2. The Functional And Utility Program Constituting Annex No. 8 To The Swz Is The Basis For: • Preparation Of A Tender Offer By The Contractor, • Carrying Out The Contractor Selection Procedure In The Design And Build Formula, In Accordance With The Procurement Law Act Public, • Conclusion Of An Agreement With The Selected Contractor For The Preparation Of Design Documentation And Construction Works1.1. The Contractor Is Obliged To: - Develop Design Documentation And Obtain The Building Permit Required By Law, - Carry Out Construction Works.2. The Contractor Undertakes To Perform All Construction Works Described In The Documentation, Including The Functional And Utility Program, Necessary To Implement The Subject Of The Agreement. The Performance Of Construction Works That Are Not Specified In The Bill Of Quantities And Are Necessary To Implement The Subject Of The Agreement In Accordance With The Documentation Does Not Require The Conclusion Of A Separate Agreement. 3. Any Work Carried Out Near The Existing Infrastructure Of The Area (Telecommunication Cables, Sewage And Water Supply Lines) Should Be Carried Out Manually With Particular Care And Under The Supervision Of An Employee - Network User.4. Detailed Conditions For The Implementation Of The Subject Of The Contract Are Specified In The Contract Template, Which Constitutes Annex No. 1 To The Swz.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document c3a93183-e528-4f41-9725-50a81258f1dc.html
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail