Tenders Are Invited For Preparation Of Technical Expertise And Design And Cost Estimate Documentation Including Optimization Of The Ventilation System At Primary School No. 2. Irena Szewińska In Łomianki
Tenders Are Invited For Preparation Of Technical Expertise And Design And Cost Estimate Documentation Including Optimization Of The Ventilation System At Primary School No. 2. Irena Szewińska In Łomianki
1. The Subject Of The Order Is The Preparation Of A Technical Expertise And Design And Cost Estimate Documentation Covering The Optimization Of The Ventilation System At Primary School No. 2. Irena Szewińska In Łomianki.2. The Scope Of Work Of Stage I Includes: 1) Conducting A Site Visit. 2) Getting To Know The Technical Documentation Of The Facility, Including As-Built Documentation, Documentation Of Maintenance And Renovation Works, And Protocols 3) Of Periodic Inspections Of The Above-Mentioned. Facility In The Possession Of The Ordering Party.4) Carrying Out Inspection And Measurement Of The Nature Of The Mechanical Ventilation Installation 5) In Accessible Places - Ducts And Fittings.6) Performing Piercings And Additional Inspections In Places Necessary For A Full And Accurate Inspection Of The System, Together With Works Related To Completing - Supplementing The Piercing Places And Installing Additional System Inspections In Necessary Places And System Inspections In The Ventilation Ducts, Necessary For Inspection Of The System7) And Proper Execution Expert Opinion.8) Carrying Out An Inspection Of The Installations Regulatory Elements, Checking The Possibility Of Regulation And Settings.9) Analyzing The Supply And Exhaust Elements Of The Ventilation Systems, Including 10) Their Location And Quantity, Checking The Blades In The Movable Diffusers.11) Carrying Out An Inspection Of The Silencer System On Individual Installations.12) Analysis Of The Connection System And Routing Of The Supply And Exhaust Systems On The Roof Of The Building.13) Checking The Flexible Connections On The Systems - Vibration Damping.14) Measurements Of The Location Of The Ventilation Units And Their Compliance With The Design.15) Analysis Of The Correctness Of The Installation And Selection Of The Hood - Kitchen.16) Inspection Of Electrical Connections, Power Supply And Protections - Resistance, And The Correctness Of The Electrical Protections Of The Supply Of The Ventilation Units.17) Measurements Of Flow Along With An Analysis Of The Operation Of The Glycol Recovery System. 18) Control Of Automation Connections, Checking The Correctness Of The Settings Of Operating Parameters 19) In Air Handling Units And Analysis Of The Correct Operation And Response Of The Air Handling Unit Of Peripheral Devices To Changes In Automation Settings.20) General Control Of Automation, Peripheral Devices And Operation Of Control Panels.21) Control Of The Operation Of Motors In Individual Air Handling Units With Current Measurements And Control Of The Mechanical Operation Of The Motors (Bearings, Blades).22) Analysis Of Heat Flow And Recovery By Heat Exchangers In Air Handling Units.23) Checking The Correct Operation Of Peripheral Devices Of Air Handling Units.24) Measurement Of The Effectiveness Of Ventilation Installations Of All Systems.25) Measurement Of The Noise Of All Ventilation Systems.26) Checking The Air Flow At The Beginning Of Ventilation Installations At Air Handling Unit
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.