upgrading 2 Bridges - Hopebru And Gunnarbuøyra Bridge . Descriptionmasfjorden Municipality Is To Upgrade/Rehabilitate 2 Bridges, Hopebru And Gunnarbuøyra. Hope Bridge Is A Single-Span Steel Girder Bridge With A Wooden Deck And A Length Of Just Under 9 Meters And A Width Of 3.5 Metres. The Bridges Weak Points Are Undersized Beams, Incipient Rot In The Wood And Weak Railings. The Existing Superstructure Is To Be Replaced With Prefabricated Concrete Elements. New Consoles / Arrangements Are To Be Cast On The Land Vessels And New Railings Are To Be Established. A Temporary Footbridge Will Be Established During The Construction Period When The Existing Bridge Is Removed Until The New Bridge Is Operational. The Gunnarbuøyra Bridge Is A Concrete Bridge With 2 Spans And A Length Of Approx. 27 Meters And A Width Of 3.5 Metres. The Bridge Has Prefabricated Concrete Ribs As A Support System. The Top Of The Cast-In-Place Wedding Deck In Concrete Acts As A Wear Layer. The Bridges Weak Points Are Poor Handrails, The Concrete Elements Are Peeling, The Wear Layer Is Weathered And There Are No Functioning Joints.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.