Tenders Are Invited For Electricity Meters – Products Necessary For The Integration Into The Intelligent Measurement Systems Of Measurement Points At Prosumers
Tenders Are Invited For Electricity Meters – Products Necessary For The Integration Into The Intelligent Measurement Systems Of Measurement Points At Prosumers
Electricity Meters – Products Necessary For The Integration Into The Intelligent Measurement Systems Of Measurement Points At Prosumers. Ii.1.4) Brief Description - The Conclusion Of A Product Framework Agreement For The Purchase Of Products Necessary For The Integration Into The Intelligent Measurement Systems Of The Measurement Points At Prosumers - In Accordance With The Specifications Of The Sc, With Respect To All The Parameters Included In The Attached Technical Sheets Total Estimated Value - Minimum 417,000.00 Lei Without Vat And Maximum 20,850,000.00 Lei Without Vat Minimum Estimated Amount Ac: 500 Pcs (Single-Phase Meter) And 500 Pcs (Three-Phase Meter); Estimated Maximum Amount Ac: 25,000 (Single-Phase Meter) And 25,000 (Three-Phase Meter) Value Of The Largest Subsequent Contract: 10,500,000.00 Lei Maximum Amount Of The Largest Estimated Subsequent Contract Cs: 12,500 Pcs (Single-Phase Meter) And 12,500 Pcs (Three-Phase Meter); Estimated Calendar For Awarding Subsequent Contracts: They Will Be Awarded According To The Needs That Arise. The First Subsequent Contract Will Be Awarded After The Conclusion Of The Framework Agreement. Minimum And Maximum Number Of Scs Estimated To Be Concluded: Minimum 2 And Maximum 4, Frequency Of Subsequent Contracts: Minimum 2 And Maximum 4, For The Entire Duration Of Ac Sc Delivery Term: In Trances, According To Art. 3.3.1 Of The Task Book The Framework Agreement Will Be Signed With A Minimum Of 1 And A Maximum Of 3 Economic Operators. According To Model Of Ac 11.5. (1) For The Signing Of Subsequent Contracts, The Promising Contracting Entity Will Always Address The Promising Supplier With The Lowest Price That Is Part Of The Framework Agreement. (2) If The Promisor Supplier 1 Does Not Sign The Subsequent Contract Within The Term Stipulated In Art. 11.4 (1), The Promising Contracting Entity Will Address The Promising Supplier 2. If The Promising Supplier 2 Does Not Sign The Subsequent Contract Within The Term Stipulated In Art. 11.4 (1), The Promising Contracting Entity Will Address The Promising Supplier 3. (3) In The Event That The Promising Supplier 3 Does Not Sign The Subsequent Contract Within The Term Stipulated In Art. 11.4 (1), The Framework Agreement Is Terminated Pursuant To Art. 16.8.(1), Lit. D). Art. 11.4. (1) The Promising Supplier Has The Obligation To Sign The Subsequent Contract Within A Maximum Of 5 Working Days From The Date Of Receipt. Art. 16.8.(1) The Termination Of The Framework Agreement Takes Place, Without Prior Notification By The Promising Contracting Entity As A Result Of: If All The Promising Suppliers Refuse To Sign The Same Subsequent Contract.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.