GTR 109317621
Tenders Are Invited For Construction Work – 1559_2025Kor_Scaffolding Work
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
109317621
Tendering Authority
Subscribe to view
Tender No
123332-2026
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work – 1559_2025Kor_Scaffolding Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
23-03-2026
Closed
Work Detail
Construction Work – 1559_2025Kor_Scaffolding Work. Modernization Immo 2 1. Ba The Scaffolding Work Advertised Is Primarily The Facade Scaffolding Required For Facade Renovation, Roof Renovation And Modernization Of The Rows Of Houses. The Tenders Are For Working And Protective Scaffolding W 09 And Lk 3 With Internal Consoles, Which Must Be Dismantled As Part Of The Construction Of The Thermal Insulation Composite System. The Scaffolding Is Temporarily Covered With Scaffolding Tarpaulins So That The Etics Can Be Applied. At The Upper End, The Scaffolding For The Roof Work (Carpenters, Roofers And Plumbers) Is Expanded Into A Roof Trap, Because Of The Steep Roofs As Fl 3 With Protective Wall Swd 2. Since The Balconies In Front Are Only Moved Outwards During The Construction Period (Railings And Infills Are Dismantled) And Remain Standing, They Must Be Integrated Into The Scaffolding Layers. This Requires Steps (Bridging Height Differences) And Additional Fall Protection In The Area Of The Balconies. After The Roof Work Has Been Completed, The Roof Trapping Must Be Dismantled For The Facade Work In The Area Of The Upper Balconies. The Scaffolding Is Erected One After The Other On The Rows Of Houses. Due To The Construction Processes, There Are Different Service Times. On The Rows Of Houses Where The Balconies Have Not Yet Been Moved At The Start Of The Scaffolding Work, The Facades Without Balconies Will First Be Scaffolded And These Facades Will Be Added After The Balcony Work. Staircases And Freight Elevators Are Provided On Both Sides Of All Rows Of Houses. A Pedestrian Tunnel Must Be Built Along Barbarossa Street. . Special Use Public Space 1 Psch Scaffolding Planning 1 Psch Proof Of Stability Scaffolding 1 Psch Facade Scaffolding, Work And Protective Scaffolding W09 Lk3 9340 M² Facade Scaffolding W09 Lk3 291530 M²where Protective Layer Under Scaffolding 660 M Terrain Adaptation 30-60 Cm, 60-100 Cm 600 M Protective Fence H 2.0 M Of Standing Scaffolding 660 M Scaffolding Cladding, Plastic Mesh Foil 9340 M² Pedestrian Tunnel 69 M Bridging At Entrances, Pedestrian Protection 63 M Bridging At Basement Exits 54 M Fall Protection Inner Railing 1390 M Deck Widening 30 Cm 4160 M Roof Guard Fl3 With Protective Wall Class C 690 M Special Constructions On Balcony Locations Stairs For Bridging Height Difference 110 Pieces Fall Protection Over Existing Balcony Locations, Tubular Construction 470 M Staircases H 11 M And H 14 M 12 Pieces Used Stairwells 390 Stwo Transport Platforms H 12 M And H 14 M 10 Pieces
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
de57ddfb-bcf7-4d95-96ff-2f9d19fdd10a.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.