Tenders Are Invited For Construction Work For Water And Sewage Pipelines - Implementation Of Engineering - Design, Construction And Author Supervision Of The Facility Reconstruction And Expansion Of Internal Technical Infrastructure Of Debelt Village, Sredets Municipality
Tenders Are Invited For Construction Work For Water And Sewage Pipelines - Implementation Of Engineering - Design, Construction And Author Supervision Of The Facility Reconstruction And Expansion Of Internal Technical Infrastructure Of Debelt Village, Sredets Municipality
Construction Work For Water And Sewage Pipelines - Implementation Of Engineering - Design, Construction And Author Supervision Of The Facility Reconstruction And Expansion Of Internal Technical Infrastructure Of Debelt Village, Sredets Municipality. The Subject Of This Contract Is The Design And Implementation Of Construction And Author Supervision For The Site Reconstruction And Expansion Of Internal Technical Infrastructure Of The Village Of Debelt, Sredets Municipality. The Public Contract Includes Design (Development Of An Investment Project In The Technical Project Phase), Cmr For The Site, As Well As Implementation Of Author Supervision During Construction. The Construction Of The Infrastructure On The Territory Of The Village Of Debelt Is Planned For A Three-Zone Implementation: Zone 1 - South-Eastern Zone With An Area Of - 0.23 Km2, Zone 2 - South-Western Zone With An Area Of ~ 1.05 Km2, Zone 3 - Northern Zone ~ 0.95 Km2;. In Addition, 2 Kps Are Planned For Zones 1 And 2. The Object Of The Order Is Divided Into 4 Sub-Objects: - Sub-Object 1: Stage 1 - Reconstruction And Expansion Of The Internal Technical Infrastructure In The South-Eastern Part Of The Village Of Debelt - Sub-Object 2: Stage 2 - Reconstruction And Expansion Of The Internal Technical Infrastructure In The South-Western Part Of The Village Of Debelt - Sub-Object 3: Stage 3 - Reconstruction And Expansion Of The Internal Technical Infrastructure In The Northern Part Of The Village Of Debelt - Subproject 4: Stage 4 - Construction Of Two New Kps, Equipment For Them And Pressure Pipelines In The Course Of Design, It Is Permissible To Foresee Additional Phasing For Each Of The Subprojects, And The Same Should Be Technically And Economically Justified. In The Course Of Design, It Is Permissible To Foresee Additional Phasing For Each Of The Sub-Objects, And The Same Should Be Technically And Economically Justified; The Term For The Preparation Of The Investment Projects In The Technical Design Phase Is At The Proposal Of The Participants, But Not More Than 120 (One Hundred And Twenty) Calendar Days. The Term Starts From The Date Of Receipt Of The Assignment Letter For The Start Of The Activity, Sent By The Employer To The Contractor, And Ends With The Signing Of A Finding Protocol By Which The Employer Accepts The Prepared Projects For The Sub-Sites. Note: The Terms For The Coordination Of The Investment Projects, The Assessment Of Their Compliance And The Issuance Of Construction Permits Are Not Included In The Term For The Preparation Of The Investment Projects And The Term For The Implementation Of The Construction, And Accordingly Are Not Indicated In The Linear Schedule Activity Ii - The Term For The Implementation Of The Construction Is At The Proposal Of The Participants, But Not More Than 600 (Six Hundred) Calendar Days. The Term Starts From The Date Of Signing The Protocol For Opening A Construction Site And Determining The Construction Line And Level Of Construction (Appendices No. 2A And To Art. 7, Para. 3, Item 2 Of Ordinance 3/31. 07. 2003 On Drawing Up Acts And Protocols During Construction) For The First Of The Sub-Sites And Ends With The Drawing Up Of A Constitutive Act To Establish The Suitability For Accepting The Construction (Appendix No. 15 To Art. 7, Para. 3, Item 15 Of Ordinance 3/31. 07. 2003) For The Last Of The Sub-Items Included In The Subject Of The Order. In The Absence Of Intervening Financing, The Deadline Is Suspended For Reasons Beyond The Contractors Control. In Accordance With Art. 48, Para. 1 Of The Zop,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.