Tenders Are Invited For “Erection Supervision And Commissioning Work At The Facilities: “Technological Site No. 1-1. System For Measuring The Quantity And Quality Of Gas (Sikg-1, Sikg-8, Sikg-9) (Item 1), Furnace Site No. 1 (Item 4), Terminal Separation Unit (Ksu-1, 2, 3) (Item 16.1), Electrodehydrator (Edg-1, 2, 3 (Item 16.2), System Measurements Of Quantity And Quality Indicators Of Oil (Sikn) (Pos. 25), Oil And Water Pumping Station (Pos. 26), Inert Gas Installation Uig-1.2 (Pos. 28.1), Nitrogen Receiver R-1.2 (Pos. 28.2), Scaling Inhibitor Dosing Unit (Bdr-3) (Pos. 40), Feeding Unit Demulsifier (Bdr-1) (Item 41), Corrosion Inhibitor Supply Unit (Bdr-2) (Item 42), Flare Separator Platform. System For Measuring Gas Quantity And Quality Indicators (Sikg-5, 11) (Item 47), Operation Room (Item 50), Block-Modular Boiler Room With Capacity 12 Mw (Item 57), Block Container Nku No. 1, 2, 4 (Item 63.1, 63.2, 63.4), Vfd Unit (Item 65), Fire Extinguishing Pump Station (Item 69), Block Box Of F
Tenders Are Invited For “Erection Supervision And Commissioning Work At The Facilities: “Technological Site No. 1-1. System For Measuring The Quantity And Quality Of Gas (Sikg-1, Sikg-8, Sikg-9) (Item 1), Furnace Site No. 1 (Item 4), Terminal Separation Unit (Ksu-1, 2, 3) (Item 16.1), Electrodehydrator (Edg-1, 2, 3 (Item 16.2), System Measurements Of Quantity And Quality Indicators Of Oil (Sikn) (Pos. 25), Oil And Water Pumping Station (Pos. 26), Inert Gas Installation Uig-1.2 (Pos. 28.1), Nitrogen Receiver R-1.2 (Pos. 28.2), Scaling Inhibitor Dosing Unit (Bdr-3) (Pos. 40), Feeding Unit Demulsifier (Bdr-1) (Item 41), Corrosion Inhibitor Supply Unit (Bdr-2) (Item 42), Flare Separator Platform. System For Measuring Gas Quantity And Quality Indicators (Sikg-5, 11) (Item 47), Operation Room (Item 50), Block-Modular Boiler Room With Capacity 12 Mw (Item 57), Block Container Nku No. 1, 2, 4 (Item 63.1, 63.2, 63.4), Vfd Unit (Item 65), Fire Extinguishing Pump Station (Item 69), Block Box Of F
Asia-Pacific Economic Cooperation, APEC,BRIC,Commonwealth of Independent States, CIS,G20,APAC (Asia Pacific)
10-03-2026
Work Detail
“Erection Supervision And Commissioning Work At The Facilities: “Technological Site No. 1-1. System For Measuring The Quantity And Quality Of Gas (Sikg-1, Sikg-8, Sikg-9) (Item 1), Furnace Site No. 1 (Item 4), Terminal Separation Unit (Ksu-1, 2, 3) (Item 16.1), Electrodehydrator (Edg-1, 2, 3 (Item 16.2), System Measurements Of Quantity And Quality Indicators Of Oil (Sikn) (Pos. 25), Oil And Water Pumping Station (Pos. 26), Inert Gas Installation Uig-1.2 (Pos. 28.1), Nitrogen Receiver R-1.2 (Pos. 28.2), Scaling Inhibitor Dosing Unit (Bdr-3) (Pos. 40), Feeding Unit Demulsifier (Bdr-1) (Item 41), Corrosion Inhibitor Supply Unit (Bdr-2) (Item 42), Flare Separator Platform. System For Measuring Gas Quantity And Quality Indicators (Sikg-5, 11) (Item 47), Operation Room (Item 50), Block-Modular Boiler Room With Capacity 12 Mw (Item 57), Block Container Nku No. 1, 2, 4 (Item 63.1, 63.2, 63.4), Vfd Unit (Item 65), Fire Extinguishing Pump Station (Item 69), Block Box Of Fire Hydrants (Item 74.1-74.10), “Site Of Instrumentation Air Compressor Station” (Item 90), “Buffer Tank Area, V=50 M3” (Item 104), “Automation Unit” (Item 118). Oil Treatment Plant With A Pipeline To The Point Of Insertion Into The Vankor - Purpe Main Oil Pipeline.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.