4.1 The Subject Of The Order Is The Execution Of A Task Called: Construction Of The Building Of The Municipal Rescue Center In Bukowice Along With The Necessary Technical Infrastructure. 4.2 A Detailed Description Of The Subject Of The Contract Was Specified In The Swz, The Contract And In: A) Design Documentation - Annex No. 10 To The Swz, B) Technical Specification For The Execution And Acceptance Of Works - Annex No. 11 To The Swz, C) Bill Of Quantities - Annex No. 12 To The Swz.4.3 In Addition, The Subject Of The Order Should Be Performed Taking Into Account The Following Issues: 1) Due To The Route Of The Water Supply Network In The Place Where The Building Is Located, The Replacement Of The Soil In The Building Should Be Taken Into Account In This Place After Dismantling The Installation Network.2) A Brick-Colored, Matt Ceramic, Flat, Overlapped Roof Tile Should Be Included.3) A Polystyrene Cornice With A Rectangular Cross-Section Of 8X18cm Should Be Included, Which Should Be Glued Along The Eaves Line And Along The Line Of The Edges Of The Slopes Of The Gable Walls.4) A Graphite Polystyrene Foam, Thickness Should Be Included On The Facade. 15Cm, 0.032.5) A Surface-Mounted Metal Multimedia Cabinet, Ip33, With 20 Keystone Sockets Should Be Included. Installation Of The Switchgear In The Room. No. 0.4. Lead The Wiring From The Switchboard To 2Xrj45 Sockets And Tv In The Room. No. 01., 0.6, And 1.1 (Attic). The Location Of The Switchgear May Be Changed After Consultation With The Investor And User In Connection With The Provision Of A Selective Alarm Notification System And The Provision Of An Electronic Alarm Siren By The Contractor.6) A Two-Station Exhaust Rail Extraction System, Dedicated To Fire Brigade Combat Vehicles, A Lower Engine Exhaust Extraction System, For 2 Combat Vehicles, E.G. Https://Www.Youtube.Com/Watch?V=R5a_D4rz6ak, Installation Complete, System, With Fan, Full Assembly And Commissioning, Installation Processing With Accompanying Works.7) An Electronic Alarm Siren Should Be Included In The Existing Digitex Dsp-50 Selective Alarm Notification System.8) Eps 100 Floor Polystyrene, Thickness Should Be Used In Sanitary And Social Rooms. 15Cm, Λ Min 0.036 W/M2k.9) The Windows Should Be Considered As Tilt And Turn Windows.10) The Color Of The Windows Should Be Dark Brown, The Windows On The Inside Of The Room Should Be White.11) The Windows Should Be Taken Into Account To Be Up To 3 Cm Wide, In The Color Of The Windows, Glued Bars Are Allowed.12) The Window Vents For Manual Control Should Be Taken Into Account.13) The Standard Installation Type Should Be Taken Into Account.14) The Offer Should Include Light, System Polycarbonate Roofing For The Entrance Door, Form And Shape As In The Façade Drawings.15) Complete Installation Equipment, So-Called White Assembly - Sanitary Installations - Sanitary Fittings And Electrical Equipment, Without Additional Accessories Should Be Taken Into Account.16) The Construction Of The Exit, Maneuve
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.