The Subject Of The Order Is The Design And Execution Of Construction, Assembly And Delivery Works As Part Of The Task: Thermal Modernization Of The Building Of The Primary School In Kiełczygłów. The Task Is Carried Out In The Design-Build Formula.1. The Task Includes In Particular: 1) Pre-Design Stage: A) Getting Acquainted With The Energy Audit Held By The Ordering Party, B) Obtaining Or Preparing Starting Materials For Design, Including Those Necessary To Submit An Application For A Building Permit Or Reporting Construction Works, Depending On Legal Requirements, C) Obtaining A Final Decision On Determining The Location Of A Public Purpose Investment, If Necessary, D) Conducting A Site Visit (Before Commencing The Implementation Of The Subject Of The Order) In Order To Specify The Necessary Details Construction, Construction And Assembly, Installation And Other Works In The Building, E) Development Of The Initial Design Concept, Including The Color Concept Of The Facade And Its Agreement With The User Of The Facility And The Ordering Party Within 30 Days From The Date Of Signing The Contract, 2) Design Stage: A) Preparation Of The Required Construction Designs, Technical Designs And Cost Estimates In Accordance With The Requirements Contained In The Act Of July 7, 1994 Construction Law And The Regulation Of The Minister Of Development Of September 11 2020 Regarding The Detailed Scope And Form Of The Construction Design (Within The Scope Of The Investment Implementation) - B) Obtaining, On Behalf Of The Ordering Party, A Final Decision On The Construction Permit/Notification Of Construction Works, If Required, C) Preparing, After The Completion Of Construction And Assembly Works, As-Built Design Documentation For All Modernizations Carried Out As Part Of The Investment, D) Developing The Technical Specification For The Execution And Acceptance Of Works Specifying The Standards (Quality) Of The Execution Of Construction Works, Taking Into Account The Properties That Should Have Construction Products/Materials To Be Used To Perform The Described Construction Works (In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program), E) Performing Authors Supervision.3) Construction And Assembly Stage: Performance Of All Construction, Demolition, Construction And Assembly, Installation And Other Works In The Primary School Building Based On The Design Documentation Prepared And Approved By The Ordering Party And The User And An Energy Audit.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.