Improvement Of Energy Efficiency Of The Health Center Building In Albigowa.1) Insulation Of External Walls Using A Seamless System Without Negative Effects On Structural Safety, Replacement Of Joinery. 2) Insulation Of The Flat Roof With Polystyrene; 3) Insulation Of The Ceiling Under The Unheated Attic With Mineral Wool; 4) Insulation Of The Ceiling Above The Basement With Laminated Ceiling Tiles. 5) All Thermal Modernization Works In Accordance With The Optimal Variant Of The Audit Along With Accompanying Works; 6) Modernization Of The Central Heating Installation With A Control System And Measurement Of Heat Energy Consumption In The Facility, Comprehensive Replacement Of Heating Elements And Pipelines, Air Conditioning, Recuperation; 7) Construction Of A Photovoltaic Installation Cooperating With Existing Electrical Installations With Real-Time Metering; 8) Construction Of A Recuperation And Air Conditioning Installation Coordinated With The System Shading The Rooms And Using Surplus Electricity From The Renewable Energy Installation9) Delivery And Installation Of 2 Stair Climbers For Vertical Communication 10) Reconstruction Of The Ramp For The Disabled In Front Of The Facility;11) Hardening Of The Parking Space For The Disabled With Marking12) Marking Of Communication Zones And Traffic Areas To Improve The Conditions Of Use By The Visually Impaired13) Execution Of Finishing Layers To Improve The Functionality Of The Rooms Due To Accessibility - Anti-Slip Floors Are Expected To Be Made As Standard, Also Improving Use By Visually Impaired Or Blind People, With Partial Road Markings, Contrasting Colors, And A Wayfinding System. It Is Planned To Install Signage In Braille. Providing Appropriate Colors For The Walls That Do Not Make It Difficult To Recognize The Rooms And Location In The Facility. 14) Construction Of A Sound Warning System And Improvement Of Fire Safety For People With Special Needs - A System Enabling Easier Wayfinding In The Event Of Evacuation, I.E. Emitting Voice Signals Informing About The Direction Of Evacuation Or The Location Of The Nearest Emergency Exits. Use Of Internally Illuminated Evacuation Safety Signs. Due To The Scope Of The Modernization Of The Installation, It Is Planned To Install Suspended Ceilings In Which Additional Installations Will Be Built, Which Will Allow For Further Expansion Of The System In The Future. 15) Renovation Of Sanitary Facilities In The Facility To Ensure The Standard Of Accessibility For People With Disabilities, Including Dedicated Equipment (Handles, Washbasins, Mirrors, Etc.) 16) Finishing, Accompanying And Repair Works Related To The Above-Mentioned Works.2. The Detailed Scope Of The Order Is Determined By: Energy Audits, Technical Documentation, Bills Of Quantities And Sst - Annex No. 10 To The Swz, And Due To The Co-Financing Of The Task, It Is Required To Ensure Accessibility In Accordance With Annex No. 12 To The Swz - Accessibility Standards For Cohesion Policy 2021-2027, To T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.