The Subject Of The Order Is The Replacement Of A Gas Boiler With A Gas Cogenerator In The Boiler Room Of The Ursynów District Office At Al. Ken 61 In Warsawgeneral Informationthe Office Building Is Located In Warsaw, In The Ursynów District, At 61 Avenue Of The National Education Commission. It Is A Detached Building With A Public Outdoor Parking Lot. The Boiler Room Of The Building Where The Cogenerator Will Be Located Is Located On Floor +7. Vertical Transport Of The Device Will Take Place: - To The Level Of Floor +5 - By Elevator, - From Floor +5 To The Boiler Room Located On The Last Floor Of The Building, Level +7 - Using The Contractors Winch, Mounted By Him To The Steel Structure Of The Roof. Before Installing The Winch, Remove The Steel Stairs (22 Steps). After Completing The Work, The Winch Should Be Dismantled And The Steel Stairs Should Be Reinstalled. Elevator Dimensions: Depth 2.10 M, Width 0.90 M, Height 2.0 M Dimensions Of 2 Pairs Of Doors Leading To The Boiler Room: Width 0.92, Height 2.0 M Scope Of Work To Be Performed: In Accordance With The Design Documentation, Construction Works Will Include: A) In The Sanitary Industry - Dismantling And Disposal Of The Existing Gas Furnace And Chimney; - Installation Of Central Heating Installations And Ct. Including Installation Of Fittings; - Installation Of The Gas Installation Along With The Installation Of Fittings; - Carrying Out The Required Installation Tests, - Insulating The Installation Pipelines, - Making Adjustments To The Central Heating Installation. And Ct., - Works Accompanying The Construction In The Field Of Central Heating Installations. And Ct., - Works Accompanying The Construction In The Field Of Gas Installation, - Finishing Works. B) In The Field Of The Electrical Industry - Construction Of Switchboard Power Supply Circuits, - Installation Of Plug-In Sockets, - Installation Of Individual Circuits, - Measurements And Tests Of All Installations, - Acceptance Of Works. A Detailed Description Of The Subject Of The Order Is Specified In The Draft Provisions Of The Contract Constituting Annex No. 2 To The Swz And The Technical Documentation Constituting Annex No. 5 To The Swz, Which Includes: • Annex No. 1: Description Of The Subject Order, • Annex No. 2: Detailed Design Of The Sanitary Installation, • Annex No. 3: Detailed Design Of The Electrical Installation, • Annex No. 4: Bill Of Quantities, • Annex No. 5: Technical Specification For The Execution And Acceptance Of Construction Works - Sanitary Industry, • Annex No. 6: Technical Specification For The Execution And Acceptance Of Construction Works - Electrical Industry, Obligations Arising From The Social Clause The Ordering Party Provides For Requirements Related To The Implementation Of The Contract In Terms Of Employment By The Contractor Or A Subcontractor Based On The Employment Relationship Of Persons In The Circumstances Referred To In Art. 95 Of The Public Procurement Law, Which Were Included In The Draft Provi
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.