2.1. Part 1 - Energy Modernization Of The Public Kindergarten In Kotorz Mały. The Thermal Modernization Of The Facility Should Be Designed In Accordance With The Pfu, Energy Audit And Description Of The Subject Of The Order. The Scope Includes Insulation Of External Walls, Insulation Of The Flat Roof, Replacement Of Windows And Doors, Replacement Of The Heat Source And Central Heating Installation, Construction Of Photovoltaic Panels With A Capacity Of 12 Kw, Replacement Of The Entire Electrical Installation And Lighting, And Performance Of All Necessary Finishing Works After Replacing The Installation And Performing Insulation. The Entire Project Should Be Carried Out In An Open Facility With A Summer Break In July. Volume Of The Heated Part 1787.5 M3 Net Area Of The Building 707.8 M2
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.