The City Of Leduc Telford Lake North Shore Outlook And Trail Improvements Project Generally Consists Of, But Is Not Limited To The Following:- Site Preparation And Management, Including Pedestrian And Vehicular Traffic Control Measures And Delineation Of Work Zones.- Tree Removals, Including Clearing And Grubbing.- Saw Cutting, Removal, And Disposal Of Existing Hard Surfacing Materials.- Removal And Disposal Of Existing Soft Surfacing Materials.- Salvaging And Relocation Of Existing Concrete Slabs And Benches.- Fine Grading, Balancing, And Preparation Of Subgrade Within The Project Limits.- Construction Of Asphalt Trails And Rest Areas, Including Subgrade Preparation, Granular Base Course, And Asphalt Supply And Placement.- Outlook Construction; Including Pre-Cast Lock Block Retaining Wall, Structural And Timber Components, And Seating Areas.- Rehabilitation Of Impacted (Including Grading) Landscaping Features Including Placement Of Topsoil, Seed, Ornamental Boulders, And Installation Of Plantings (Including Maintenance).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.