4.1. Order For The Execution Of The Task Entitled: Modernization Of Street Lighting In The Dołhobyczów Commune.4.2. Scope Of The Task:1. The Subject Of The Order Includes:1.1 Delivery Of The Following Lighting Points:• 387 Led Road Luminaires With A Power Of 72W.1.2 Replacement/Installation Of Wires For Lighting Fixtures Installed On Concrete Poles Together With The Fixtures - 387 Pcs.1.3 Replacement Of The Complete Fuse Box On Concrete Poles - 387 Pcs.1.4 Measurements Of The Insulation Resistance Of The Electrical Installation, Checking Automatic Power Off - 387 Pcs. 1.5 Modernization - Removal Of Street Lighting Control Cabinets From Transformer Stations Using A Remotely Programmable Astronomical Clock With Reactive Power Compensation - 59 Pcs. 1.6 Installation Of Control System Elements In Led Luminaires - 387 Pcs. 1.7 Equipment And Commissioning Of The Lighting Control And Monitoring System. 1.8 Preparation Of As-Built Documentation. Detailed Description Of The Subject Of The Order Specified In Annex No. 1A To Swz. The Contractor Is Obliged To Complete The Order On The Terms And Conditions Described In The Draft Contract, I.E.: A) As Part Of Stage 1, The Contractor Is Obliged To: 1.1 Deliver Lighting Fixtures: • 387 Led Road Luminaires With A Power Of 72 W. B) As Part Of Stage Ii, He Is Obliged To Perform: 2.1 Replacement/Installation Of Cables For Lighting Fixtures Installed On Concrete Poles Along With Fixtures - 387 Pcs. 2.2 Replacing The Complete Fuse Box On Concrete Poles - 387 Pcs.2.3 Measurements Of Insulation Resistance Of The Electrical Installation, Checking Automatic Power Off - 387 Pcs.2.4 Modernization - Removal Of Street Lighting Control Cabinets From Transformer Stations Using A Remotely Programmable Astronomical Clock With Reactive Power Compensation - 59 Pcs.2.5 Installation Of Control System Elements In Led Luminaires - 387 Pcs.2.6 Equipping And Commissioning The Lighting Control And Monitoring System. 2.7 Preparation Of As-Built Documentation. It Will Be Possible To Proceed With The Implementation Of Stage Ii Of The Order In Question After The Completion Of Stage I According To The Protocol.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.