The Task Will Include: • Thermal Modernization Of The External Partitions Of The Foresters Lodge Building, • Distribution Of Central Heating Installations. The Office Part And The Residential Part, Including The Replacement Of The Solid Fuel Boiler And The Installation Of A Heat Pump In The Office Part, • Installation Of A 6 Kwp Photovoltaic Installation. The Detailed Scope Of Works To Be Performed Is Presented In The Description Of The Subject Of The Order Constituting Annex No. 11 To The Swz, Which Includes Technical Documentation, Energy Audit, Technical Specification For The Execution And Acceptance Of Works (Hereinafter Referred To As Stwior) And Bill Of Quantities. The Works Must Be Performed In Accordance With The Swz, Provisions Of The Concluded Contract, Technical Documentation, Principles Of Current Technical Knowledge, Applicable Regulations And Standards In This Area And Construction Practice. The Contractor Will Be Obliged To Provide The Necessary Test And Verification Reports, Including Inspections Of Installations And Connections Made By Persons With Appropriate Authorizations.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.