Task No. 11) The Subject Of The Order Includes The Scope Indicated In: A) Functional And Utility Program Entitled: Modernization Of The Sports Complex Moje Boisko - Orlik 2012 At The Primary School No. 4. Mikołaja Kopernika W Zawiercie Performed By Kruz Budownictwo Sp. Z O. O. Ul. Myszkowska 41; 42-350 Mysłów (Hereinafter Referred To As Pfu); B) Bill Of Quantities. 2) The Project Includes The Design And Modernization Of The Sports Complex Moje Boisko - Orlik 2012 At Primary School No. 4 In Zawiercie, As Part Of The Project It Is Planned To: A) Dismantle The Existing Sports Equipment - 2 Football Goals And Re-Install It After Replacing The Surface, B) Removal Of The Existing Artificial Grass And Polyurethane Surface; C) Shaping, Compacting And Supplementing The Layer Foundation;D) Laying An Artificial Grass Surface On The Base;E) Laying A Polyurethane Surface;F) Installation Of Football Goals, Installation Of Basketball Baskets, Volleyball Posts;G) Replacing The Net On The Ball Catchers And Ball Catchersh) Replacing The Fence Of The Complex;I) Replacing Lighting Fixtures On The Existing Poles,J) Delivery And Installation (Waste Bins, Seats, Regulation Board);K) Hardening The Area With Concrete Cubes;L) Pitch Area (Artificial Grass): 32.0 X 62.5 Mm) Pitch Area (Polyurethane): 19.1 X 32.1 M3) Replacing The Surface On The Sports Fields Of The Orlik Complex In Zawierciea) Football Pitch - 2000.0 M2b) Multi-Purpose Pitch - 613.10 M2note. ! The Drawing Attached To The Ffu Shows Backfill Grass. However, The Ordering Party Decided To Replace The Pitch Surface With Fill-Free Grass. Regarding The Type Of Grass, The Provisions Of The Fup Apply.4) The Above Scope Of Works Should Be Carried Out On The Basis Of Applicable Regulations (Including In Particular The Provisions Of The Construction Law) By A Contractor With Appropriate Experience And Construction Potential And By Persons With Appropriate Professional Qualifications And Professional Experience.5) The Contractors Obligations Will Include The Design And Execution Of The Designed Construction Works, Carrying Out Acceptance Procedures And Fulfilling Contractual Obligations During The Warranty Period. We Would Like To Inform You That The Ordering Party Has A Notification Of The Works Prepared At The Stage Of Submitting Applications For Funding. 6) The Implementation Of The Task Should Meet The Program Requirements Of The Ministry Of Sport And Tourism - Sports Complexes Modernization Program Moje Boisko - Orlik 2012 Edition 2025; The Facilities Should Be Constructed Using Technology That Ensures The Safety Of Users, And The Adopted Technical And Functional Solutions Should Meet Existing Standards. The Above Means The Need To Apply Polish Standards, In Particular: Pn-En 14877:2014-02 (For Multi-Purpose Sports Fields, Tennis Courts And Athletics Facilities), Pn-En 15330 (For Sports Fields With Artificial Grass); Technical Guidelines Required By The Ministry Are Available On The Ministrys Website At: Https:/
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.