Preparation Of A Feasibility Study And A Functional And Utility Program For The Construction Of An Energy System Consisting Of A Pv Installation With A Minimum Capacity Of 2.5 Mwp And An Energy Storage Unit Consisting Of Sections With A Total Capacity Of At Least 2.0 Mwh And A Hybrid Set Of A Heating And Cooling Station, Combined With A Ground Exchanger In A Dedicated, Insulated Quartz Bed. The Team Will Consist Of A Heat Pump With A Power Of Twe Min. 120 Kw And A Chilled Water Generator With A Power Of Twe Min. 80 Kw For Which A Dedicated Ground Source With A Heat/Cool Exchanger In A Dedicated, Insulated Quartz Bed Was Used
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.