Laboratory, Optical And Precision Equipments (Excl. Glasses) – 01/2026-1014 Lysimeteranlage. The Specialist Company Hired After Completion Of The Award Procedure Must Complete The Following Work Steps To Set Up The Lysimeter System: - Production Of The Lysimeter Pairs In Container Construction Including Stainless Steel Lysimeter Vessel, Load Triangle And Collar Measuring Equipment For The Lysimeter Vessels With Weighing System, Lysimeter Heater, Tensiometers, Soil Moisture Probes, Suction Probes For Pore Water Sampling And Tilting Counter Removal Of Soil Monoliths (Diameter 1 M², Depth 2.5 M) On The Test Site (5 Lysimeters) And On Another Field Site At A Maximum Distance Of 50 Km (5 Lysimeters) With A Milling And Shearing Device. Transport Of The Soil Monoliths From The Second Location To The Test Area. Installation Of The Pairs Of Lysimeters And The Lysimeter Vessels Filled With The Soil Monoliths On The Test Area. Construction Of A Lysimeter Control Station For Data Recording With A Control Cabinet And Mobile Phone Router. Delivery And Setup Of A Lysimeter Data Protocol And A Database
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.