Tenders Are Invited For Construction-Site Supervision Services - Selection Of A Contractor For The Preparation Of A Complex Report For The Assessment Of Compliance With The Main Requirements For Construction And Technical Control Under The Constructive Part And Exercise Of Construction Supervision During The Construction Of The Site Road Іі-53 Yambol-Sredets, Section Bypass Of The Town Of Yambol-South, Stage I: ...Prod. In Additional Information (Bt-728-Procedure)
Tenders Are Invited For Construction-Site Supervision Services - Selection Of A Contractor For The Preparation Of A Complex Report For The Assessment Of Compliance With The Main Requirements For Construction And Technical Control Under The Constructive Part And Exercise Of Construction Supervision During The Construction Of The Site Road Іі-53 Yambol-Sredets, Section Bypass Of The Town Of Yambol-South, Stage I: ...Prod. In Additional Information (Bt-728-Procedure)
Construction-Site Supervision Services - Selection Of A Contractor For The Preparation Of A Complex Report For The Assessment Of Compliance With The Main Requirements For Construction And Technical Control Under The Constructive Part And Exercise Of Construction Supervision During The Construction Of The Site Road Іі-53 Yambol-Sredets, Section Bypass Of The Town Of Yambol-South, Stage I: ...Prod. In Additional Information (Bt-728-Procedure). The Subject Of This Public Procurement Is Selection Of A Contractor For The Preparation Of A Complex Report For The Assessment Of Compliance With The Main Requirements For Construction And Technical Control Under The Constructive Part And The Exercise Of Construction Supervision During The Construction Of The Site Road Ii-53 Yambol-Sredets, Section Bypass Of The Town Of Yambol-South, Stage I: From Km 147+824.90 (Kilometer According To The Technical Design Of 2008) ≡ Km 148+753 (Kilometer Along Existing Road Ii-53) To Km 148+890.35 (Kilometer According To Technical Project From 2008) ≡ Km 150+159 (Kilometer Along Existing Road Ii-53), Yambol District. Compliance With The Basic Requirements For The Constructions And Carrying Out Technical Control Under The Constructive Part, And Exercising Construction Supervision During The Construction Of The Site, With A View To Carrying Out Quality Construction Of The Site, In Accordance With The Regulatory Requirements And In Compliance With The Agreed Deadlines. Existing Situation: The Newly Designed Road Section, Subject To The Preparation Of A Technical Project And Subsequent Execution Of Construction And Installation Works, Falls Entirely Within The Boundaries Of The Town Of Yambol And Is Part Of The Citys Primary Street Network. Beginning Of The Section: Km 147+824.90 (Kilometer According To The Technical Project From 2008), Corresponding To Km 148+753 According To The Mileage Of The Existing Road Ii-53 - Immediately Before The Intersection With Atanas Kratunov Street (Coinciding With The Route Of Road Ii-53) And Zlaten Rog Street; End Of The Section: Km 148+890.35 (Kilometer According To The Technical Project From 2008), Corresponding To Km 150+159 According To The Mileage Of The Existing Road Ii-53 - Connection With The Already Built Left Lane Of The Bypass Road - South. The Investment Project (The Project Documentation) Should Be Prepared By The Contractor Under The Design And Construction (Engineering) Contract In The Volume And Content Specified In The Design Assignment (Appendix A) To The Public Procurement Documentation And In Accordance With The Regulatory Acts And Technical Specifications. *Note: For The Information Of The Participants In This Public Procurement, The Design Assignment And Its Annexes (Appendix A) Will Be Attached To The Public Procurement Documentation! The Subject Of The Public Procurement Includes A Description Of The Activities Under The Procurement, According To The Performance Requirements (Appendix No. 1) Attached To The Public Procurement Documentation. The Investment Project (Project Documentation) Should Be Developed By The Contractor Under The Design And Construction (Engineering) Contract In The Volume And Content Specified In The Design Assignment (Appendix A) To The Public Procurement Documentation And In Accordance With The Regulatory Acts And Technical Specifications.*Note: For Information On The Participants In The Present Public Procurement, The Designer Assignment Will Be Attached To The Public Procurement Documentation
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.