GTR 109176861
Tenders Are Invited For Adaptation Of The City Of Dębica To Climate Change - Creation Of A Pocket Park At Ul. Rzeszowska And Ul. Tadeusz Kościuszko In Dębica (2)
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
109176861
Tendering Authority
Subscribe to view
Tender No
BZP.271.07.2026.MK
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Adaptation Of The City Of Dębica To Climate Change - Creation Of A Pocket Park At Ul. Rzeszowska And Ul. Tadeusz Kościuszko In Dębica (2)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
06-03-2026
Closed
Work Detail
1. The Subject Of The Order Includes The Construction Of A Pocket Park With Accompanying Infrastructure, A Closed Retention Reservoir, A Fountain And Small Architectural Objects As Part Of The Task Adaptation Of The City Of Dębica To Climate Change. Investment Location - Plots No. 302, 303/1, 303/4, 304/2, District 0004 Dębica. When Implementing The Order, The Contractor Undertakes To Comply With The Dnsh Principle (Do No Significant Harm, I.E. Do Not Cause Serious Damage). The Ordering Party Provides For Requirements Related To Green Procurement: • Limiting The Use Of Plant Protection Products And Using Alternative Pest Control Techniques • Purchasing, Whenever Possible, Native Ornamental Plants Produced Using Ecological Methods• Purchasing Products Delivered In Compostable, Reusable Or Biodegradable Packaging• Avoiding The Use Of Peat As A Soil Improver• Using Various Measures To Reduce Water Demand, Such As Mulching, Arranging Plants According To Their Water Needs Or Selecting Adapted/Native Ornamental Plantsthe Performance Of The Above-Mentioned Duties Will Be Verified By The Supervisory Inspector. In Addition, The Ordering Party Recommends:• Using Compost From Separately Collected Waste As Soil Improver And Fertilizer, Using Strict Quality Controls• Using Non-Potable Water Wherever Possible, Delivering Water Directly To The Root Zone Whenever Possible• Avoiding Watering The Surface During The Warmest Hours Of The Day When Evaporation Is Highest, Especially In Summer• Applying Preventive Measures To Control Peat And Control Invasive Alien Species• Ensuring Separate Collection Of Waste And Treatment Of Organic Waste For Composting And Mulching Purposesin The Documentation Technical Specifications For The Separator Of Petroleum Substances Include C 40/50 Class Concrete. The Ordering Party Allows The Use Of C 35/C45 Class Concrete. The Full Description Of The Subject Of The Order Can Be Found In Section B Of The Swz - Description Of The Subject Of The Order
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e34a48c1-b70e-4346-aa78-4f0258c4d597.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.